PMLA anticipatory bail requires satisfaction of twin conditions, while predicate-offence protection does not extend to independent money-laundering pr...
School-affiliation charges remain taxable where not directly connected with examinations, while extended limitation requires proof of deliberate tax e...
Concessional penalty for search-disclosed unreconciled jewellery applies where substantive disclosure conditions are met despite omission from origina...
Page of 4826
Press 'Enter' after typing page number.
1 to 20 of 96510 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
Onboarding of CDSCO, WCCB, MeitY and the Textile Committee onto SWIFT 2.0 creates a single-touch digital interface for EXIM clearances, with consolidated data fields, document codes and declarations formulated for immediate consumption under the platform -- this will replace separate PGA filings and remove physical certificate production by enabling digital validation with the Bill of Entry. New LPCO/NOC document codes and trade upload codes are prescribed and two existing codes are updated, standardising document handling. PGA officers are collocated onto Customs IT infrastructure for NOC processing. Functionality will be trialled for stakeholder feedback, with targeted PGA integration by 31.03.2026 and full phased onboarding by 31.03.2027.
Onboarding of CDSCO, WCCB, MeitY and the Textile Committee onto SWIFT 2.0 creates a single-touch digital interface for EXIM clearances, with consolidated data fields, document codes and declarations formulated for immediate consumption under the platform -- this will replace separate PGA filings and remove physical certificate production by enabling digital validation with the Bill of Entry. New LPCO/NOC document codes and trade upload codes are prescribed and two existing codes are updated, standardising document handling. PGA officers are collocated onto Customs IT infrastructure for NOC processing. Functionality will be trialled for stakeholder feedback, with targeted PGA integration by 31.03.2026 and full phased onboarding by 31.03.2027.
Note: It is a system-generated summary and is for quick reference only.