Political contribution deductions require genuine transactions; banking records and party registration alone cannot defeat evidence of accommodation e...
Post-death GST liability permits fresh proceedings against legal representatives, while discontinued-business recovery remains limited to the inherite...
Non-confirmation of FEMA seizure prevents adjudicators from overriding pending appellate findings on recorded reasons and suspected foreign asset hold...
Nature of transaction - supply of goods or transfer of property - work orders is required to fill in the foundation or plinth by silver sand in layers and consolidating the same by saturation with water ramming which also involves earth work for filling in the compound, tank, low land, ditches etc. It is, therefore, not a contract for the supply of goods, but the transfer of property in such goods in the course of preparing the site for construction - it is works contract, as defined u/s 2(119) and taxable @ 18%
Nature of transaction - supply of goods or transfer of property - work orders is required to fill in the foundation or plinth by silver sand in layers and consolidating the same by saturation with water ramming which also involves earth work for filling in the compound, tank, low land, ditches etc. It is, therefore, not a contract for the supply of goods, but the transfer of property in such goods in the course of preparing the site for construction - it is works contract, as defined u/s 2(119) and taxable @ 18%
Note: It is a system-generated summary and is for quick reference only.