Certificate of Chartered Engineer
X X X X Extracts X X X X
X X X X Extracts X X X X
....ineer after physical verification of the machines installed at the factory premises) Table Sl. No. Make / Model Name of Manufacturer Machine No. (Serial No.) Machine Reg. No. (If already assigned by System) No. of 1[cups] Gear Box Ratio of the Machine (1) (2) (3) (4) (5) (6) (7) 1 &nbs....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... 3. Certification I hereby certify that: 1. I have personally examined the ____ (number) machines listed in the table above at the factory premises of the _____________ on __________ (Date of Inspection). 2. The details furnished in the table above, specifically the maximum rated speed (5[Column 13]) and weight of package (6[Column 11]), are true and correct....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... if the machine packs in pouches, tins or containers, as the definition of "Weight" in Section 2(s) of the Act applies to these specific containers. 7[2. Column 13 (Total packing capacity): This is the maximum rated speed. It should be calculated as: (Packing Capacity of each cup or funnel) x (Number of cups or funnels). This figure determines the Cess slab in Schedule II of the Act.] 3. Modific....
TaxTMI