2014 (7) TMI 788
X X X X Extracts X X X X
X X X X Extracts X X X X
....umar, Member (T) Shri Vijay Kumar, Advocate, for the Appellant. Shri R.K. Mathur, DR, for the Respondent. ORDER The delay in filing the present appeal is of 30 days which stands attributable to the proprietor of the appellant-company being away to his native place and falling sick there. In view of the above and keeping in mind that the delay is on the lower side, we condone the same a....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... clamp and providing a switch and holder with bulb as per contract awarded by M/s. Jaipur Vidyut Vitran Nigam Ltd. They were also laying cables under or along side roads and between grids and sub-stations/transfer sub-stations enroute and laying of cables upto the distribution point of residential houses. He submits that this stand clarified by the Board vide their Circular No. 123/5/2010-TRU, dat....
TaxTMI