Disciplinary proportionality requires penalties for Authorised Representative misconduct to match proven harm, leading to reconsideration of registrat...
Political contribution deductions require genuine transactions; banking records and party registration alone cannot defeat evidence of accommodation e...
Post-death GST liability permits fresh proceedings against legal representatives, while discontinued-business recovery remains limited to the inherite...
Non-confirmation of FEMA seizure prevents adjudicators from overriding pending appellate findings on recorded reasons and suspected foreign asset hold...
Retrospective withdrawal of net SGST reimbursement under IPR 2015 was invalidated as arbitrary, discriminatory and unconstitutional insofar as it affected projects that had invested and commenced production in reliance on the scheme. A policy-review power permitted prospective modification but did not support retrospective deprivation without material showing overriding public interest. Failure to issue or communicate a timely rejection after inspection and verification triggered deemed approval of provisional Priority Sector status; that approval remained subject to reimbursement conditions and quantification. The Negative List did not exclude clinker-based cement manufacture where the specified exception, investment threshold and verification supported eligibility. Net SGST reimbursement must therefore be determined and released under IPR 2015, subject to applicable conditions.
Retrospective withdrawal of net SGST reimbursement under IPR 2015 was invalidated as arbitrary, discriminatory and unconstitutional insofar as it affected projects that had invested and commenced production in reliance on the scheme. A policy-review power permitted prospective modification but did not support retrospective deprivation without material showing overriding public interest. Failure to issue or communicate a timely rejection after inspection and verification triggered deemed approval of provisional Priority Sector status; that approval remained subject to reimbursement conditions and quantification. The Negative List did not exclude clinker-based cement manufacture where the specified exception, investment threshold and verification supported eligibility. Net SGST reimbursement must therefore be determined and released under IPR 2015, subject to applicable conditions.
Note: It is a system-generated summary and is for quick reference only.