SEZ-unit profit deduction covers voluntary transfer-pricing adjustments, while exempt-income costs, foreign-exchange loss and ITeS comparables are exa...
Infrastructure-development deduction remains available to EPC contractors when substantive statutory conditions outweigh contractor labels in agreemen...
Explained Investment Sources: documented gifts and traceable salary savings supported deletion of additions for property and mutual-fund SIP investmen...
Internal comparable pricing supports arm's-length interest on compulsorily convertible debentures, preventing their recharacterisation as equity for t...
Electronic upload of DRP directions on the ITBA module constitutes receipt of those directions in a faceless assessment. The final assessment must therefore be completed within the period prescribed under section 144C(13), calculated from that upload date. Where the final assessment is completed after the prescribed period, it is time-barred and liable to be set aside. Other assessment grounds remain open where invalidity is determined solely by limitation.
Electronic upload of DRP directions on the ITBA module constitutes receipt of those directions in a faceless assessment. The final assessment must therefore be completed within the period prescribed under section 144C(13), calculated from that upload date. Where the final assessment is completed after the prescribed period, it is time-barred and liable to be set aside. Other assessment grounds remain open where invalidity is determined solely by limitation.
Note: It is a system-generated summary and is for quick reference only.