Customs-controlled cargo movement now includes GDL, subject to EXIM prioritisation, segregation, verification, reconciliation and enforcement safeguar...
GST cross-empowerment remains effective without conditional notification, while duplicate proceedings require established safeguards against overlappi...
Page of 4910
Press 'Enter' after typing page number.
641 to 660 of 98195 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
Electronic upload of DRP directions on the ITBA module constitutes receipt of those directions in a faceless assessment. The final assessment must therefore be completed within the period prescribed under section 144C(13), calculated from that upload date. Where the final assessment is completed after the prescribed period, it is time-barred and liable to be set aside. Other assessment grounds remain open where invalidity is determined solely by limitation.
Electronic upload of DRP directions on the ITBA module constitutes receipt of those directions in a faceless assessment. The final assessment must therefore be completed within the period prescribed under section 144C(13), calculated from that upload date. Where the final assessment is completed after the prescribed period, it is time-barred and liable to be set aside. Other assessment grounds remain open where invalidity is determined solely by limitation.
Note: It is a system-generated summary and is for quick reference only.