Supervisory permanent establishment requires project-wise duration and qualifying construction nexus; offshore supplies and salary reimbursements rema...
Deduction u/s 43B - once excise duty on the basis of goods manufactured is paid same is allowable, direct correlation between the duty paid and the goods manufactured or liability to pay excise duty or removal of goods are irrelevant
Deduction u/s 43B - once excise duty on the basis of goods manufactured is paid same is allowable, direct correlation between the duty paid and the goods manufactured or liability to pay excise duty or removal of goods are irrelevant
Note: It is a system-generated summary and is for quick reference only.