SEZ-unit profit deduction covers voluntary transfer-pricing adjustments, while exempt-income costs, foreign-exchange loss and ITeS comparables are exa...
Infrastructure-development deduction remains available to EPC contractors when substantive statutory conditions outweigh contractor labels in agreemen...
Explained Investment Sources: documented gifts and traceable salary savings supported deletion of additions for property and mutual-fund SIP investmen...
Internal comparable pricing supports arm's-length interest on compulsorily convertible debentures, preventing their recharacterisation as equity for t...
Electronic uploading of Dispute Resolution Panel directions on the ITBA portal constitutes receipt in faceless assessment proceedings for calculating the period for a final assessment under section 144C(13). A subsequent physical or manual receipt by the Assessing Officer does not extend that limitation. Directions uploaded on 30 December 2025 made the final assessment completed on 19 February 2026 time-barred; it was treated as null and void, while the remaining grounds were left open.
Electronic uploading of Dispute Resolution Panel directions on the ITBA portal constitutes receipt in faceless assessment proceedings for calculating the period for a final assessment under section 144C(13). A subsequent physical or manual receipt by the Assessing Officer does not extend that limitation. Directions uploaded on 30 December 2025 made the final assessment completed on 19 February 2026 time-barred; it was treated as null and void, while the remaining grounds were left open.
Note: It is a system-generated summary and is for quick reference only.