Development norms for non-processing areas set sector-specific limits and require BOA case-by-case approval of infrastructure. The instruction requires the Board of Approval to approve non-processing area infrastructure items case-by-case considering SEZ size, processing distribution, available FAR, employee projections, location and town planning norms, with category-wide ceilings set by the local development authority and revisable proportionately; construction may be phased linked to processing activity levels, developers must obtain local master plan approval, and sector-differentiated DDA-derived indicative norms specify maximum non-processing areas, assumed FAR, total floor space and detailed floor-space and land-use allocation percentages.
Cases where this provision is explicitly mentioned in the judgment/order text; may not be exhaustive. To view the complete list of cases mentioning this section, Click here.
Provisions expressly mentioned in the judgment/order text.
Development norms for non-processing areas set sector-specific limits and require BOA case-by-case approval of infrastructure.
The instruction requires the Board of Approval to approve non-processing area infrastructure items case-by-case considering SEZ size, processing distribution, available FAR, employee projections, location and town planning norms, with category-wide ceilings set by the local development authority and revisable proportionately; construction may be phased linked to processing activity levels, developers must obtain local master plan approval, and sector-differentiated DDA-derived indicative norms specify maximum non-processing areas, assumed FAR, total floor space and detailed floor-space and land-use allocation percentages.
Full Summary is available for active users!
Note: It is a system-generated summary and is for quick reference only.