Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / TMI Blogs / RSS

2026 (8) TMI 637

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....Vs. Roca Bathroom Products (P.) Ltd. [2022] 445 537 (Madras) and also plethora of orders passed by the Co-ordinate Bench of the Tribunal, Hyderabad Bench sought for allowing the Ground No. 15 of the Assessee. 3. Per contra, the Ld. Department's Representative submitted that the issue of limitation arising from the interplay between Section 144C and Section 153 of the Act is presently unsettled and pending adjudication before the Hon'ble Supreme Court in the case of ACIT Vs. Shelf Drilling Ron Tappmeyer Ltd. in Special Leave to Appeal (C) Nos. 20569-20572/2023 therefore, deciding the very same issue by this Tribunal at this stage would be premature, thus submitted that the Tribunal cannot decide the issue of limitation in terms of the ratio laid down by the Hon'ble High Court of Madras in the case of Roca Bathroom Products (P) Ltd. (supra). Accordingly, the Ld. Department's Representative sought for deferral of adjudication of the present Appeal and also the issue of limitation. The Ld. Department's Representative has also filed detail written submission. 4. The identical submissions of the parties have been considered by us in the case of Teva Pharmaceutic....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....y limitation. Per contra, it has been contended by the learned senior counsels appearing for the respondent(s)/assessees that the outer time limit under Section 153 is applicable to every proceedings on remand and the department having slept over the issue for several years, cannot now redo the proceedings afresh, after certain rights have vested with the assessees. Even if specific provisions are not there to deal with this situation, the proceedings must be concluded within a reasonable time and hence the impugned proceedings are liable to be struck down and rightly done so by the learned Judge. 19. Admittedly, the facts including the dates are not under dispute. As regards the appeal in W.A.No.1854 of 2021, even though the remand was on 24.01.2013 and the assessee had received the order on 08.02.2013, the first notice by the DRP was issued on 19.02.2014 and the first hearing in the Chennai office was on 10.03.2014. Therefore, it is lucid that the DRP had the knowledge of the order before 19.02.2014. The matter was heard on various dates in Chennai office and written submissions were also filed. Thereafter, the files have been transferred to Bengaluru by the CBDT notific....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ctions have to be filed, the DRP has to issue the directions and the final order is to be passed. The provisions under section 144C and section 153 are not mutually exclusive as both contain provisions relating to Section 92CA and are inter-dependent and overlapping. On remand, prior to amendment as per Section 153 (2A), the Assessing officer is given 12 months to pass a fresh assessment order. Therefore, it is incumbent on him to do so, irrespective of the fact that DRP has completed the hearing and issued the directions or not. As rightly held by the learned judge, we are of the view that the DRP ought to have concluded the proceedings within 9 months from the date of receipt of the Tribunal's order, when it had issued a notice on 19.02.2014 and conducted the hearing as early as on 10.03.2014 and on several dates. The DRP at Chennai, in fact ought to have passed orders before 19.11.2014, even if the date of receipt of the notice is taken as 19.02.2014. In that event, the assessing officer ought to have passed the order before 31.12.2014 or at the latest before 31.03.2015 considering that the order was received during the financial year 2013-14. The transfer of the files to Bengal....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....". (4) The courts have also to keep in mind that an interpretation which reduces one of the provisions as a "dead letter" or "useless lumber" is not harmonious construction. (5) To harmonise is not to destroy any statutory provision or to render it otiose." (ii) CIT v. Hindustan Bulk Carriers, (2003) 3 SCC 57 : 2002 SCC OnLine SC 1226: "16. The courts will have to reject that construction which will defeat the plain intention of the legislature even though there may be some inexactitude in the language used. (See Salmon v. Duncombe [(1886) 11 AC 627 : 55 LJPC 69 : 55 LT 446 (PC)] AC at p. 634, Curtis v. Stovin[(1889) 22 QBD 513 : 58 LJQB 174 : 60 LT 772 (CA)] referred to in S. Teja Singh case [AIR 1959 SC 352 : (1959) 35 ITR 408]). 18. The statute must be read as a whole and one provision of the Act should be construed with reference to other provisions in the same Act so as to make a consistent enactment of the whole statute. 19. The court must ascertain the intention of the legislature by directing its attention not merely to the clauses to be construed but to the entire statute; it must compare the clause with other parts of ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....for the last date to pass the orders. The limitation prescribed under the statute is for the assessing officer and therefore, it is his duty to pass order in time irrespective of whether the directions are received from DRP or not. As held by us above, the DRP will have no authority to issue directions after nine months and a further period of one month as per section 144C (13) and three months under section 153(2A) is available, within which period no orders have been passed in the present cases. The reference made by the learned senior counsels on the judgments in Nokia India Private Ltd (supra) and Vedanta Ltd (Supra) is well founded. The timeline given under the Act is to be strictly followed. 24. In so far the show cause notice issued is concerned, though generally, the Court wit will be circumspect at the stage of show cause notice, the law on the point is well belled with exception carved in the following cases: a. when the nonce is without authority, b. when notion is without authority c. when notice is issued without following the procedures under the applicable Act of the rules framed there under and d. when the notice is issue....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....can be conveniently ascertained and collected. Delay in completion of assessment often creates problems. The assessee would be required to keep up all the evidence in support of his transactions. Where evidence is necessary, with the lapse of time, there is scope for its being lost. Oral evidence as and when required to be produced by the assessing authority may not be available if a long period intervenes between the transactions and the consideration of the matter by the assessing authority Long delay thus is not in the interest of either the assessee or the State. In view of the fact that a period of limitation has been prescribed for bringing the escaped turnover into the net of taxation, such an eventuality cannot be grappled with appropriately unless timely assessment is completed. In several taxing statutes, even in a situation like this, where assessment under Section 11(3) or 28(3) of the respective Acts is contemplated, a period of limitation is provided. Until by statute, such a limitation is provided, it is proper for the State Governments to require, by statutory rules or appropriate instructions, to ensure completion of assessments with expedition and reasonable haste....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....thus, cannot be said to be unreasonable. Reasonable period, keeping in view the discussions made hereinbefore, must be found out from the statutory scheme. As indicated hereinbefore, maximum period of limitation provided for in sub-section (6) of Section 11 of the Act is five years. 21. In SB Gurbaksh Singh v. Union of India ((1976) 2 SCC 181 1976 SCC (Tax) 177: (1976) 37 STC 425] Untwalia, J., speaking for the Bench, opined (SCC p. 188, para 15) 15. Apropos the fourth and the last submission of the appellant, suffice it to say that even assuming that the revisional power cannot be exercised suomotu after an unduly long delay, on the facts of this case it is plain that it was not so done. Within a few months of the passing of the appellate order by the Assistant Commissioner, the Commissioner proceeded to revise and revised the said order. There was no undue or unreasonable delay made by the Commissioner. It may be stated here that an appeal has to be filed by an assessee within the prescribed time and so also a time-limit has been prescribed for the assessee to move in revision. The appellate or the revisional powers in an appeal or revision filed by an assessee ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... proceedings as in the original assessment, would have to be completed within 12 months, as the very purpose of extension is to ensure that orders are passed within the extended period, as otherwise the extension becomes meaningless. (e) The outer time limit of 33 months in case of reference to TPO under Section 153, would not refer to draft order, but only to final order and hence, the entire proceedings would have to be concluded within the time limits prescribed. (f) The non-obstante clause would not exclude the operation of Section 153 as a whole. It on implies that irrespective of availability of larger time to conclude the proceedings, final orders are to be passed within one month in line with the scheme of the Act. (g) When no period of limitation is prescribed, orders are to be passed within a reasonable time, which in any case cannot be beyond 3 years. However, when the statute prescribes a particular period within which orders are to be passed, then such period, irrespective of whether it is short or long, shall be applicable." 8. The above ratio laid down by the Hon'ble High Court of Madras in the case of Roca Bathroom Products Pvt. Ltd....