Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

Cabinet approves development of 6/4 lane Elevated Corridor along Varuna River Bank & its Ramps/Loops in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.10,998.32 Crore

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....abinet approves development of 6/4 lane Elevated Corridor along Varuna River Bank & its Ramps/Loops in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.10,998.32 Crore<BR>News and Press Release<BR>Dated:- 15-7-2026<BR><BR>The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the development of a 43.218 km Link/Connector Cor....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ridor connecting NH-31 and the Varanasi Ring Road along the River Varuna for decongestion of Varanasi city in Uttar Pradesh. The project comprises a 6/4-lane predominantly elevated corridor, including main carriageway, flyovers, loops, ramps and service roads, and will be implemented by the National Highways Authority of India (NHAI) under the Hybrid Annuity Model (HAM) at a total capital cost of ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....Rs.10,998.32 crore, including a civil construction cost of Rs.4,565.33 crore and land acquisition cost of Rs.934.91 crore. The corridor is a major component of the Varanasi Decongestion Plan and will provide seamless connectivity between NH-31 and Kashi Railway Station, while substantially improving access to Varanasi Ring Road, Varanasi Airport, Kashi Railway Station, Varanasi City Railway Sta....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....tion, Varanasi Junction, Deen Dayal Upadhyaya Junction, Ramnagar Port, Sampurnanand Sanskrit University, the ghats of Varanasi and the adjoining Chandauli region. Designed for an operating speed of 80-100 km/h, the project will reduce travel time between NH-31 and Kashi Railway Station from approximately 40 minutes to 20 minutes, representing a reduction of nearly 50 per cent. It will significa....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ntly decongest the city's road network, improve road safety, reduce vehicle operating costs and facilitate faster, uninterrupted movement of passenger and freight traffic. The project will also strengthen regional connectivity by improving access to one Economic Node (Chandauli Social Economic Zone), one Social Node (Chandauli) and six major Logistics Nodes, thereby enhancing multimodal integra....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....tion in line with the PM Gati Shakti National Master Plan. It will facilitate efficient movement of agricultural produce, industrial goods, construction materials and minerals, improving logistics efficiency and supporting sustainable economic growth across eastern Uttar Pradesh. Overall, the project will create a modern, access-controlled urban transport corridor that enhances connectivity, st....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....rengthens multimodal transport integration, promotes tourism and economic development, and improves the quality of life for residents and visitors to Varanasi. Map of Corridor: &nbsp; =============<BR> News - Press release - PIB....