Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / TMI Blogs / RSS

Notification specify the courses of instructions and practices for initial training in rescue and recovery work under rule 141(1) of the Occupational Safety, Health and Working Conditions (Central) Rules, 2026

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....TIFICATION Dhanbad, the 1st July, 2026 G.S.R. 576(E).-In exercise of the powers conferred on me under sub rule (1) of rule 141 of the Occupational Safety, Health and Working Conditions (Central) Rules, 2026, I, Ujjwal Tah, Chief Inspector-cum Facilitator of Mines, also designated as the Director General of Mines Safety, hereby, specify the courses of instructions and practices for initial tr....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....atus and tube apparatus provided. (iii) the use of methods and apparatus for reviving persons; (iv) the properties, and the methods of detection of noxious and inflammable gases which may be found in mines; (v) the taking of gas samples in irrespirable atmosphere; (vi) the reading of mine plans; (vii) Conduct or rescue and recovery work. (viii) conduct of rope rescue using specif....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....aratus shall comprise the following operations:- (i) repeatedly raising and lowering of a weight of 25 kilograms to and from a height of 1.8 metres by means of a rope and pulley; (ii) walking continuously at a fair pace for half an hour; (iii) building and removing temporary stoppings of stone, brick, sand-bags, brattice cloth or other materials, and carrying the materia....