Certificate of Chartered Engineer
X X X X Extracts X X X X
X X X X Extracts X X X X
...._______________________________ 2. Details of Machines Examined (To be filled by the Chartered Engineer after physical verification of the machines installed at the factory premises) Sl. No. Make / Model Name of Manufacturer Machine No. (Serial No.) Machine Reg. No. (If already assigned by System) No. of 1[cups] Gear Box Ratio of the Machi....
X X X X Extracts X X X X
X X X X Extracts X X X X
....ctory premises of the _____________ on __________ (Date of Inspection). 2. The details furnished in the table above, specifically the Maximum Rated Speed (Column 11) is true and correct to the best of my knowledge and belief based on the technical specifications and physical verification of the machines. 3. I have verified that the machines are not capable of the production speeds more than th....
X X X X Extracts X X X X
X X X X Extracts X X X X
....nnels)]. 2. Modifications: If a machine has been modified to alter its speed or capacity, the certificate must reflect the current actual maximum capacity, not just the manufacturer's original specification. *************** NOTES:- 1. Substituted vide Notification No. 01/2026-Central Excise (N.T.) dated 31-01-2026 w.e.f. 01-02-2026 before it was read as,&nbs....
TaxTMI