Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / TMI Blogs / RSS

Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....abinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore<BR>News and Press Release<BR>Dated:- 10-9-2025<BR><BR>The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... approved the Construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.400 km and Total Capital Cost of Rs. 4447.38 crore. The section passes through or provides connectivity to important regional cities such as Mokama, Barahiya, Lakhisarai, Jamalpur, Munger connecting ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....to Bhagalpur, as indicated in the map at Annexure-I. The Munger-Jamalpur-Bhagalpur belt in Eastern Bihar is emerging as a key industrial region focusing on ordinance factory (Existing gun factory and 1 more proposed as part of Ordnance Factory Corridor by M/o Defence), locomotive workshop (in Jamalpur), food processing (e.g., ITC in Munger) and related logistics & warehousing hubs. Bhagalpur stan....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ds out as a textile and logistics hub, led by Bhagalpuri silk (details of proposed textile ecosystem in Bhagalpur. Barahiya is emerging as a region for food packaging, processing and agro-warehousing. The increased economic activity in the region is expected to drive up the freight movement and the traffic on the Mokama-Munger section in the future. The 4-lane access-controlled corridor with clos....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e tolling, supporting average vehicular speeds of 80 km/h with design speed of 100 km/h will reduce the overall travel time to approximately 1.5 hours, while offering safer, faster, and uninterrupted connectivity for both passenger and freight vehicles. The proposed project with 82.40 km will generate about 14.83 lakh man-days of direct employment and 18.46 lakh man-days of indirect employment. T....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....he project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor. Annexure-1 Project Alignment Map for Mokama-Munger<BR> News - Press release - PIB....