Just a moment...

Top
FeedbackReport
×

By creating an account you can:

Logo TaxTMI
>
Feedback/Report an Error
Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

Cabinet approves Development of 4-Lane Badvel- Nellore Highway from Badvel- Gopavaram Village on National Highway NH-67 to Guruvindapudi on NH-16 in Andhra Pradesh on Design-Build-Finance-Operate-Transfer (DBFOT) mode

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....abinet approves Development of 4-Lane Badvel- Nellore Highway from Badvel- Gopavaram Village on National Highway NH-67 to Guruvindapudi on NH-16 in Andhra Pradesh on Design-Build-Finance-Operate-Transfer (DBFOT) mode<BR>GST<BR>Dated:- 28-5-2025<BR><BR>Total capital cost is Rs.3653.10 crore for a total length of 108.134 km The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shr....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....i Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor&nbsp; with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode. The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....Vishakhapatnam-Chennai Industrial Corridor (VCIC), Orvakal Node on Hyderabad-Bengaluru Industrial Corridor (HBIC) and Krishnapatnam Node on Chennai-Bengaluru Industrial Corridor (CBIC). This will have a positive impact on the Logistic Performance Index (LPI) of the country. Badvel Nellore Corridor starts from Gopavaram Village on the existing National Highway NH-67 in the YSR Kadapa District and ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in SPSR Nellore District of Andhra Pradesh and will also provide strategic connectivity to the Krishnapatnam Port which has been identified as a priority node under Chennai-Bengaluru Industrial Corridor (CBIC). The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km from 142 km to 108.13 km as ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....compared to the existing Badvel-Nellore road. This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption thereby reducing carbon foot print and Vehicle Operating Cost (VOC). The details of project alignment and Index Map is enclosed as Annexure-I. The project with 108.134 km will generate about 20 lakh man-days of direct employme....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....nt and 23 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor. Annexure-I The details of Project Alignment and&nbsp;Index Map: Figure 1: Index Map of Proposed Corridor Figure 2: Detailed Project Alignment &nbsp;<BR> News - Press release - PIB....