Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / TMI Blogs / RSS

2017 (10) TMI 1626

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....nafter, be referred to as they are arrayed in these appeals. The appellant filed four C.O.Ps. under Section 9 of the 1996 Act requesting the Commercial Court to grant an injunction restraining the 1st respondent, its agents, servants, or any other persons claiming through or under it, from taking coercive action pursuant to the letter dated 23.02.2017 or otherwise, including but not limited to, restraining it from invoking or encashing the schedule bank guarantees issued by the 2nd respondent; and to further restrain the 2nd respondent from honouring/encashing the schedule bank guarantees at the request of the 1st respondent. In the petition filed by them under Section 9 of the 1996 Act, the appellant had stated that they had entered into various contracts in respect of the design, engineering, procurement, supply, assembly, construction, erection, mechanical completion, pre-commissioning, commissioning and full performance testing of a pulverized coal fired power plant consisting of 2 x 660 MW supercritical boiler based plant with NCC Power Projects Limited, and a consortium of China National Technical I & E Corporation and Tianjin Electric Power Construction Company ("CTC" ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... required type of coal, was the only reason for noncompletion of the performance guarantee tests; the 1st respondent has been commercially operating Unit-1 from 15.11.2016, and Unit-2 from 18.02.2017, using coal (other than the design coal); they have been selling electricity commercially; and, on the other hand, the 1st respondent had implied, in the impugned letter, that the Units would not be treated as having been completed. The appellant further stated that, according to the clauses of the On-Shore Service Contract, they were entitled for extension of time to finish the project, since the reasons for the delay were not attributable to them, and were beyond their control; the reasons for the delay had been communicated to the 1st respondent regularly through various e-mails, correspondence, MPR's, in the meetings, and in accordance with the terms and conditions of the contract; the appellant had repeatedly sought extension of time, as the delay was either attributable to the 1st respondent or to CTC which would entitle the appellant for extension of time as per the contract; however, the same had been arbitrarily denied by the 1st respondent, despite admitting that the delay....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....aid letter was also marked to the appellant which showed that, according to the first respondent itself, the delay was due to CTC, and not the appellant; the 1st respondent had levied liquidated damages of USD 40,978.312 on CTC to be paid on or before 09.03.2017, failing which the same would be set off by the 1st respondent against payments required to be made to CTC; the 1st respondent was trying to unjustly enrich itself levying liquidated damages on the appellant, though the delay was on the part of the supplier; the first respondent was threatening to encash the bank guarantees furnished by the appellant; and this was clearly fraudulent, and contrary to the purpose for which the bank guarantees were submitted. In their petition, the appellant had stated that, in view of the categorical admission of the 1st respondent in their letter dated 23.02.2017, that the delay was due to CTC, levy of liquidated damages on the appellant, for the delay caused by the 1st respondent itself and CTC, was contrary to the provisions of the On Shore Service Contract Agreement and the Co-ordination Agreement; the onus on the appellant to prove delay on the part of CTC, had also been discharged by....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... assets in India; even if the appellant were to succeed in the main dispute by way of arbitration, they would not be able to recover the money illegally obtained on encashment of the bank guarantees; the project itself was given as security to the banks for the loans extended by them to the 1st respondent; a successful result in the arbitral proceedings would be futile, causing irreparable loss and damage to the appellant, its promoters, shareholders, stake holders and lenders; and it would also have an adverse effect on their employees and their family members. The appellant would further state that the On Shore Services Contract Agreement, and the Co-ordination Agreement, provide for adjudication of disputes by way of arbitration; since no amicable settlement had been reached between the parties, they intended to invoke the arbitration clause against the 1st respondent; the illegal coercive steps by the 1st respondent as threatened, including fraudulent encashment of the bank guarantees, was imminent; if stay of all coercive steps, including encashment of the bank guarantees, was not granted, the appellant would suffer irretrievable loss and injury; it would also frustrate all....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e EPC contracts, the appellant was required to undertake the works in such a manner that the scheduled completion date of Units-I and II would be achieved within 42 months and 45 months, from the date of issuance of notice to proceed, respectively; under the Co-ordination Agreement, the provisional acceptance test for Unit-I and Unit-II was required to have been achieved, and duly completed, by 10.11.2015 (inclusive of a three month grace period from 10.08.2015) and 10.02.2016 (inclusive of a three month grace period from 10.11.2015), respectively; it was agreed, among the parties, that time would be of essence for delivery of the equipment, and completion of works, under the EPC contract; they had requested the appellant to perform its obligations including expediting works to meet the completion schedule; because of the delay, in achieving provisional acceptance and final acceptance for Units-I and II, the 1st respondent incurred significant losses including in relation to payment of interest during construction to its lenders, cost overruns, overruns above the project cost, payment of penalty to Power Grid Corporation of India Limited due to delay in evacuation of power, etc; an....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....elay, in completion of the provisional acceptance test for Units-I and II, attributable to them; and therefore the appellant's contention that the liquidated damages could not be levied on them for the delay caused by the 1st respondent, and its supplier- CTC, did not merit acceptance. The 1st respondent denied that the reasons, behind the delay in achieving provisional acceptance, were due to the delay in supplies by CTC, and because the 1st respondent did not provide the designed coal. It is also denied that they were not able to provide the specified type of coal till date. It is stated that the appellant has neither furnished details of the design coal that was to be used by the 1st respondent in terms of any agreed technical specification, nor have they explained how the actual coal, being used by the 1st respondent, did not match the design coal; the appellant had also failed to explain how the alleged non-usage of design coal had adversely affected the achievement of provisional acceptance; the appellant had failed to achieve final acceptance in terms of Article 6.4 of the 2nd amendment to the On-shore Services Contract Agreement; the Units could not, therefore, be treate....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....l equities in the appellant's favour, for grant of injunction, merely because the 1st respondent was owned and operated by a Singapore based entity i.e., M/s. Sembcorp Utilities Pte Ltd; or that the appellant would not be able to recover the money from the 1st respondent on encashment of the bank guarantees even if they were to succeed in the arbitral proceedings. The 1st respondent states that it is a Company incorporated in India under the Companies Act, 1956, and has significant assets in Nellore District of Andhra Pradesh. In their reply, to the counter-affidavit filed by the first respondent, the appellant denied the allegation of abuse of process of court. They submitted that the validity of the bank guarantees had been extended; and all essential ingredients, to restrain invocation of bank guarantees, had been pleaded and established. Reference is made by them to the report of the Central Electricity Authority, Bangalore dated 06.03.2017 to contend that Unit 1 was synchronized on 26.05.2016 and started operating commercially on 17.11.2016, and Unit 2 was synchronized on 02.02.2017, commissioned on 15.02.2017 and started operating commercially on 21.02.2017; the first resp....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....nt, all the disputes are required to be resolved through mutual discussions and negotiation in an equitable manner; the appellant intended to go for arbitration for adjudication of the subject disputes; in reply to the first respondent's letter dated 23.02.2017 they had, by their letter dated 08.03.2017, disputed levy of liquidated damages, and had denied all the allegations made therein; and the first respondent could not set off liquidated damages, or encash the securities, for damages which were arbitrarily levied or were disputed as not due. In his order in C.O.P. No.63 of 2017 and batch dated 18.04.2017, (against which these appeals are preferred), the Learned Judge, Commercial Court-cum-XXIV Additional Chief Judge, City Civil Court, Hyderabad observed that there was no dispute with regards existence of an arbitration clause in the On- Shore Services Contract agreement and the Co-ordination agreement; the appellant had furnished the schedule bank guarantees in favour of the first respondent, and they were being extended from time to time; according to Clause 10.6 of the coordination agreement, it was agreed between the parties that the contracts were independent and separat....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ntees, furnished as security for guaranteeing performance of the contract by the appellant, it is necessary, at the outset, to examine the purpose for which a bank guarantee is furnished. When, in the course of commercial dealings, an unconditional bank guarantee is given or accepted, the beneficiary is entitled to realize such a bank guarantee in terms thereof irrespective of any pending disputes. The bank giving such a guarantee is bound to honour it as per its terms irrespective of any dispute raised by its customer. The very purpose of giving such a bank guarantee would, otherwise, be defeated. (U.P. State Sugar Corpn. v. Sumac International Ltd. (1997) 1 SCC 568). Between the bank and the beneficiary, the moment there is a written demand for invoking the bank guarantee, pursuant to a breach of the covenants, the bank is bound to make payment under the guarantee. (Gujarat Maritime Board 2016) 10 SCC 46 = MANUPATRA/SC/1105/2016). The commercial purpose, for which the system of confirmed irrevocable documentary credit has been developed in international trade, is to give to the seller an assured right to be paid before he parts with the control of the goods, and that does not ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....n either side, under different heads. II. CONTRACT OF BANK GUARANTEE IS AN INDEPENDENT CONTRACT: Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that the contract of guarantee is a complete and separate contract by itself; and the court/tribunal would only interfere if the invocation is against the terms of the guarantee itself. On the other hand Sri D.Prakash Reddy, Learned Senior Counsel appearing on behalf of the appellant, would submit that, in Tarapore & Co.3, the Supreme Court examined the disputes, with respect to the parent contract/underlying contract, to ascertain the existence of special equities. A bank guarantee constitutes a separate, distinct and independent contract. This contract is between the Bank and the beneficiary. It is independent of the main contract between the person who has furnished the bank guarantee and the beneficiary. (Hindustan Construction Co. Ltd. v. State of Bihar(1999) 8 SCC 436; Tarapore & Co. (1996) 5 SCC 34). A bank guarantee is the common mode of securing payment of money in commercial dealings as the beneficiary, under the guarantee, is entitled to realise the whole of the amo....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....pleted within a period of 42 months, for which they were required to furnish a bank guarantee for 10% of the contract price as performance guarantee. On the bank guarantee being invoked by the respondent, the appellant filed a Suit in the Bombay High Court, and an interim order was initially passed restraining invocation of the bank guarantee which was confirmed later. The order passed by the Learned Single Judge was challenged before the Division Bench of the Bombay High Court which vacated the injunction with respect to mobilisation advance, but maintained the injunction in respect of the performance guarantee. The respondents preferred an appeal against that part of the order of the Division Bench wherein the injunction order, in respect of the performance guarantee, was upheld. The Supreme Court noted that, while the bank guarantee used the expression "agree unconditionally and irrevocably" to guarantee payment to the Executive Engineer on his first demand without any right of objection, it had thereafter qualified it by using the expression "in the event that the obligations expressed in the said clause of the abovementioned contract had not been fulfilled by the contractor gi....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... addition, a bipartite agreement called the coordination agreement. The second amendment to the on-shore service contract dated 10.04.2011 provided, in Article 2.7, for the addition of a new Article 4.8 to be added to the on-shore service contract. Clause 4.8 stipulated that, to secure the appellants performance of its obligations, the appellant acknowledged and agreed that the first respondent shall have the right to hold the Contract Performance Guarantee, issued by a reputable commercial bank acceptable to the first respondent, as security for the performance of the appellant's obligations under the agreement. The Article further records the appellants acknowledgment that, in the event amounts are due under the agreement (including late completion liquidated damages, and ancillary power guarantee liquidated damages and any amount due and payable from the appellant to the first respondent or to be paid by the appellant on behalf of the first respondent, and such amounts are not paid when due), the first respondent shall have the unconditional and irrevocable right to demand and draw such amounts under the Contract Performance Guarantee equal to the amount owing by the appellant w....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... without any reference to the Contractor. Any such demand made by the Owner on the Bank shall be conclusive and binding notwithstanding any difference between the Owner and the Contractor or any dispute pending before any Court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to revoke this Guarantee during its currency without previous consent of the Owner and further agrees that the Guarantee herein contained shall be enforceable till ninety (90) days after expiry of its validity." The bank guarantee also records that the first respondent shall have the fullest liberty, without affecting in any way the liability of the bank under the guarantee, from time to time, to extend the time for performance of the contract by the appellant; the first respondent shall have the fullest liberty, without affecting the guarantee, to postpone, from time to time, the exercise of any power vested in them or of any right which they might have against the appellant, and to exercise the same at any time in any manner; the bank would not be released of their obligations under the bank guarantee by any exercise by the first respondent of its liberty with reference to all the mat....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... appellant, to the extent referred to in the bank guarantees, without any demur, and even without reference to the appellant. The demand made by the first respondent on the bank, in terms of the contract of bank guarantees, was to be conclusive and binding notwithstanding any difference between the appellant and the first respondent or any dispute pending between them before any Court, Tribunal, arbitrator or any other authority. III. EXCEPTIONS, TO THE RULE THAT AN INJUNCTION SHOULD NOT BE GRANTED AGAINST INVOCATION OF BANK GUARANTEES, ARE NOT LIMITED TO FRAUD, AND CANNOT BE PLACED IN A STRAIT JACKET: Sri D. Prakesh Reddy, Learned Senior Counsel appearing on behalf of the appellant, would submit that, besides fraud, encashment of the bank guarantees can be injuncted in cases of irretrievable injury, extra-ordinary special equities, and invocation of bank guarantee not being in terms of the bank guarantee itself; a straight jacket formula cannot, universally, be applied to all cases; and every case has to be decided with reference to the facts involved therein. On the other hand Sri C.V.Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would sub....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....nd Hindustan Construction Co. Ltd. v. Satluj Jal Nigam Ltd AIR 2006 Delhi 169; State Trading Corporation of India Ltd. v. State Bank of India 200 (2013) DLT 289 = MANU/DE/1273/2013). Let us now examine whether the appellant has conclusively established that, in the present batch of cases, the exceptions, to the Rule against injuncting invocation of the bank gurantees, are attracted. Before doing so, it is necessary to examine whether, and to what extent, the documents filed at a stage posterior to the filing of the O.Ps, under Section 9 of the 1996 Act on 06.03.2017, can be looked into, and then consider the rival contentions on whether or not the first respondent has committed breach of the contract justifying grant of temporary injunction on a prima facie case being made out. IV. CAN DOCUMENTS, FILED SUBSEQUENT TO THE FILING OF THE O.P, BE RELIED UPON? Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that the additional documents, that the appellant is now relying upon to establish special equities, were filed before the Commercial Court only as an afterthought, that too because the first respondent had, in its reply to ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ng territorial jurisdiction over such arbitration where such Commercial Court has been constituted. Since the application made by the appellant herein, under Section 9 of the 1996 Act, is more than the specified value, they had invoked the jurisdiction of the Commercial Court under Section 10(3) of the 2015 Act. Section 9(1)(ii) of the 1996 Act enables a party to apply to a Court for interim measures with respect to the matters specified in Clauses (a) to (e) thereunder, and confers the same power on the Court for making orders as it has for the purpose of, and in relation to, any proceedings before it. Consequently the Commercial Court, before which the application under Section 9 of the 1996 Act was made, would have the same power to make orders under Section 9(1)(ii) of the 1996 Act as it has in relation to any proceedings before it. Section 2(e)(1) of the 1996 Act defines "Court" to mean, in case of an arbitration other than an international commercial arbitration, the principal Civil Court of original jurisdiction in a district, and includes the High Court in the exercise of its ordinary original civil jurisdiction, having jurisdiction to decide the questions forming the su....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e Code of Civil Procedure (which relates to disclosure, discovery and inspection of documents) in Suits before the Commercial Court. Order XI Rule 1(a) requires the plaintiff to file a list of all documents and photocopies of all documents in its power, possession, control or custody, pertaining to the Suit, along with the plaint, including (a) documents referred to and relied on by the plaintiff in the plaint; (b) relating to any matter in question in the proceedings, in the power, possession, control or custody of the plaintiff, as on the date of filing of the plaint, irrespective of whether the same is in support of or adverse to the plaintiff's case. Clause (c) of Order XI Rule 1 stipulates that nothing in Rule (1) shall apply to documents produced by the plaintiff, and relevant only (i) for examination of the defendant's witness, or (ii) in answer to any case set-up by the defendant subsequent to the filing of the plaint, or (iii) handed over to a witness merely to refresh his memory. The submission, made on behalf of the appellant, that Order XI Rule 1 does not apply, since the appellant's case falls within the ambit of clause (c)(ii) of Order XI Rule 1 is only to be noted....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....osed along with the plaint or within the extended period set out above, save and except by leave of the Court and such leave shall be granted only upon the plaintiff establishing reasonable cause for non-disclosure along with the plaint. Neither did the appellant, while filing the Section 9 petition, seek leave of the Court to file such additional documents within thirty days of filing the O.P nor was leave sought by them at any time thereafter. It is only if leave had been sought would the question of the Court being satisfied, that the appellant had established reasonable cause for non-disclosure along with the plaint, arise for consideration. The appellant filed the O.P. before the Commercial Court on 06.03.2017. Along with the O.P, they filed a copy of the certificate of incorporation; a copy of the coordination agreement between them and the first respondent dated 23.03.2014; a copy of the onshore service contract dated 10.04.2011; a copy of the Supply (FOB contract) between the appellant, the first respondent and CTC dated 20.01.2012; a copy of the letter addressed by the first respondent separately to them, and to the CTC, on 23.03.2017 claiming liquidated damages; a copy....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....of the letter dated 01.04.2017 stating that the use of non-design coal by the first respondent had made CTC suffer great losses for which CTC could claim extension of time and additional costs; (iii) a copy of the Director's report of the first respondent wherein it is stated that, as at 31.07.2016, the first respondent had achieved overall EPC progress of 97.67%. It is only at the stage of filing an appeal, against the order of the Court below, i.e on 08.06.2017, have the appellants filed (i) a copy of the provisional balance sheet of the first respondent as at 31.03.2017; (ii) a copy of the balance confirmation letter of the first respondent as on 31.03.2017 forwarding a copy of the extract of the ledger balance of the appellant in the books of accounts of the first respondent as on 31.03.2017; (iii) a copy of the arbitration notice issued by the appellant to the first respondent dated 27.05.2017; (iv) a copy of the first respondent's e-mail dated 02.06.2017 to discuss the possibility of an amicable settlement; and (v) a copy of the e-mail sent by the appellant to the first respondent on 05.06.2017. While some of the aforesaid documents relate to a period posterior to the f....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....he appellant had sought a temporary injunction in the O.Ps, to restrain the first respondent from encashing the bank guarantee pending its disposal, the O.Ps themselves were dismissed by the Commercial Court. The discretion of the Court is exercised to grant a temporary injunction only when the following requirements are made out by the plaintiff: (i) existence of a prima facie case as pleaded, necessitating protection of the plaintiff's rights by issue of a temporary injunction; (ii) when the need for protection of the plaintiff's rights is compared with or weighed against the need for protection of the defendant's rights or likely infringement of the defendant's rights, the balance of convenience tilting in favour of the plaintiff; and (iii) clear possibility of irreparable injury being caused to the plaintiff if the temporary injunction is not granted. In addition, temporary injunction being an equitable relief, the discretion to grant such relief will be exercised only when the petitioner's conduct is free from blame and he approaches the court with clean hands. (Seema Arshad Zaheer v. Municipal Corpn. of Greater Mumbai (2006) 5 SCC 282). While the aforesaid factors must be ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... themselves by other means, and generally not for the Court to come to their rescue with injunctions. (Singh Consultants and Engineers (P) Ltd.7). The Courts usually refrain from granting injunction to restrain the performance of contractual obligations arising out of a letter of credit or a bank guarantee between one bank and another. If such temporary injunctions were to be granted in a transaction between a banker and a banker, restraining a bank from recalling the amount due when payment is made under reserve to another bank, or in terms of the letter of guarantee or credit executed by it, the whole banking system in the country would fail. In view of the banker's obligation under an irrevocable letter of credit to pay, his buyer- customer cannot instruct him not to pay. (Singh Consultants and Engineers (P) Ltd. (1988) 1 SCC 174; United Commercial Bank (1981) 2 SCC 766 = (1981) 3 SCR 300). The Court should not lightly interfere with the operation of irrevocable documentary credit, except where there is a serious dispute to be tried, and there is a prima facie act of fraud. (Edward Owen Engineering Ltd. [1978] 1 All E.R. 976; Singh Consultants and Engineers (P) Ltd. (1988....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....0). The Court should look into the terms of the bank guarantee, and the letter of invocation, in deciding the fate of a prayed injunctive relief. (Continental Construction Ltd. v. Satluj Jal Vidyut Nigam Ltd 2006 (1) ARBLR 321 (DELHI) = MANU/DE/8175/2006 (Delhi HC)). As the appellant has sought an injunction to restrain the first respondent from invoking the bank guarantee in the Section 9 petition, and in the appeal now filed before us, the scope and ambit of the contract of bank guarantee primarily necessitates examination, and not the underlying contract, for the rival claims, based on disputes arising from the underlying contract, are matters for examination and resolution in arbitral proceedings. Nonetheless, the contentions urged by the Learned Senior Counsel on either side are being noted to show that the appellant does not have a fool proof case of even the underlying contract being vitiated by fraud justifying an injunction being granted to restrain the first respondent from invoking the bank guarantees. (a) THE FIRST RESPONDENT HAS COMMENCED COMMERCIAL OPERATIONS: Sri D. Prakash Reddy, Learned Senior Counsel appearing on behalf of the appellant, would submit that....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ce test certificate is issued by the first respondent; and the tripartite discussion held on February 22, 2017, and the letter dated January 02, 2017 show that the progress could not have been 97.67% complete as on July 31, 2016. In the Director's Report, presented to the shareholders as part of the 8th Annual Report together with audited financial statements for the year ending 31.03.2016, the Directors of the first respondent stated that, as on July 31st 2016, the first respondent had achieved over all EPC progress of 97.67%; all BTG and BOP material supply had been completed, and supply of balance mandatory spares were on going. The fact, however, remains that, subsequently, the appellant, in its letter dated 2.01.2017, informed the first respondent that over a year had elapsed since they had lodged their first request for extension in the contract period without any constructive response from the first respondent, despite which they had continued to render services under the contract; and a number of delay events had occurred in the project which were beyond their control, and for reasons not attributable to them, but they had claimed only a few of them as justification for ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e for fifteen continuous days and during each such fifteen-day test period, the Unit shall be operated for not less than 72 hours continuously at 100% STG MCR; (b) the unit demonstrates an electrical output equal to or greater than 97.5% of the electrical output guarantee, and a gross heat rate equal to or lower than 103% of the heat rate guarantee and, for the purpose of demonstrating the achievement of the gross heat rate and electrical output levels required for provisional acceptance for the facility, the provisional acceptance test shall consist of the operation of the units as a whole for not less than four hours at a load condition of 100% STG MCR and 80% STG MCR; (c) the units meets the ramp rates, reactive power capability, full load rejection capability; maximum capacity at value wide open conditions as per technical specifications; and (d) the units meet the guaranteed emission limits. It further stipulates that, once the Unit has successfully completed commissioning and start-up, and is capable of safe operation in accordance with applicable laws, applicable permits, prudent utility practices, the technical limitations and requirements of the operating manual, the appel....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....rtite discussions were held between the appellant, the first respondent and CTC. From the minutes of the tripartite discussions held on 22.02.2017 it does appear that several items of works had not been completed by the appellant by then. Whether or not these works, which the appellant was required to complete, and had agreed to do so, by the last week of February and by mid March, 2017, are significant are again matters for consideration in the arbitral proceedings, and not in a Section 9 petition wherein the relief, of injunction against encashment of bank guarantee, was sought. While the first respondent does appear to have commenced commercial operations, it does also seem that the appellant did not conduct the provisional acceptance test for Units 1 and 2 till the filing of the O.P on 06.03.2017, or at any time thereafter. Whether inability of the appellant to conduct the provisional acceptance test is due to the failure of the first respondent to fulfill their obligations under the Contract, is for the arbitral tribunal to consider, and are not matters for examination either in Section 9 petition, or in an appeal arising from an order passed therein. (b) EFFECT OF THE DELA....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... a right which has been granted to the first respondent under the EPC Contracts, and the Co-ordination Agreement; the liquidated damages, claimed from the parties i.e. the Petitioner and CTC, have become due on account of the delay caused in performing different obligations under different agreements; the two claims are independent of each other, and can be invoked simultaneously without prejudice to one another; the appellant became liable to pay liquidated damages to the first respondent for failure to complete the works under the EPC Contracts, and for failure to achieve Provisional Acceptance; Clause 10.6 of the Co-ordination Agreement stipulates that the EPC Contracts are independent and separate contracts; irrespective of the belated supply of the BTG equipment by CTC, the appellant was bound to complete other works under the EPC Contracts which were not dependant on the supply of BTG equipment; the said works were not completed by the appellant on time; they caused delay in supply and erection of foundations, delay in construction of civil and steel structures, and delay in delivery of equipment; they failed to augment all necessary resources including skilled manpower, plan....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e 09.03.2017. It is relevant to note that this letter was addressed by the first respondent to the CTC on 23.02.2017, a day after the tripartite meeting held between the appellant, the first respondent and the CTC on 22.02.2017 wherein the appellant and the CTC had acknowledged that several requirements were yet to be completed; and they would be completed on the dates, mentioned in the minutes, which are from 23.02.2017 till 15.03.2017. By their letter dated 23.02.2017, the first respondent informed the appellant that they had, time and again, requested the latter to expedite completion of the works under the EPC contracts, but they had not, till date, claimed liquidated damages from the appellant because of cash flow issues of the appellant, and in the interest of achieving project completion at the earliest; the appellant was yet to complete the works under the EPC contracts, and there had been inordinate delay in achieving provisional acceptance, as set forth in detail in Annexure-I; and the first respondent was invoking its right to claim the following liquidated damages in accordance with the terms of each contract i.e., (a) Rs.134 crores under the Civil and Construction W....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....he On-shore services Agreement, only the undisputed amount can be set off for Late Completion Liquidated Damages; neither the impugned notice dated 23.02.2017, nor any of its previous communications, contain any allegation that the appellant is not entitled for the benefits of the exclusionary clause; the appellant is, therefore, not legally required to plead that they do not fall under any one of the said exceptions; and, at any rate, the appellant has pleaded that, according to the co-ordination agreement, it is entitled for exclusion of the delay caused by the CTC in supply of the BTG Equipment. On the other hand Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that Clauses 2.3 and 2.4 of the co-ordination agreement make it clear that the contractual obligations of the appellant, under the co-ordination agreement, were much wider than mere facilitating co-ordination between the first respondent and the CTC; in terms of the proviso to Clauses 3.1 and 3.2 of the Co-ordination Agreement, the appellant is barred from claiming exclusion from liability for any delay liquidated damages and/or for delay in completion of Provisiona....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... and/or install the BTG equipment, material or components supplied by the CTC; or (B) delay was due to interfacing or lack of interfacing between the CTC and the appellant; or (C) the delay or such non-achievement of provisional acceptance tests for Unit -1 by 10th November, 2015 and Unit 2 by 10th February, 2016 was attributable to the appellant's breach or default of any of the contracts; or (D) the appellant did not make every reasonable effort to mitigate the effect of such delay or non-achievement. Clause 3.3 stipulated that, where any delay by the CTC in meeting the BTG FOB delivery dates set out in Clause 3.1 did not fall under any of the exclusions set out in sub-clauses 3.1(A), (B), (C) and (D), or where any delay by the CTC, in meeting the performance test dates set out in Clause 3.2, did not fall under any of the exclusions set out in clause 3.2(A), (B), (C) or (D), the appellant should be granted a day-for-day extension on the overall completion schedule without any entitlement to any damages for prolongation costs in respect of any part of the work under the contracts in respect of such extension of time. Clause 3.3 places the onus of proving, that the delay was sol....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....missioning of supplies under the Owner's Supply (C & F) Contract. Article 7.2.2 stipulates that the appellant shall pay the late completion liquidated damages, required to be paid under Article 7.2, monthly in arrears, against the first respondent's debit note, by wire transfer on the tenth day of each month, with the last such payment to occur on provisional acceptance with respect to the facility; if the appellant is obligated to pay any late completion liquidated damages to the first respondent under Article 7.2, and such undisputed amount is not paid within the time period referred to above, the first respondent shall have the right to offset any such amount against any amounts then or thereafter due from the first respondent to the appellant, or to exercise its rights against any security provided by the appellant, in such order as the first respondent may elect in its reasonable discretion. The construction of the aforesaid clauses, to determine whether or not the appellant is liable for liquidated damages, for the delay in achieving provisional acceptance test by the prescribed dates, is again a matter for the arbitral tribunal to consider. Suffice it to note that Clau....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ign coal; the first respondent has used non-design coal in gross violation of the agreed terms and conditions, because of which the boiler equipment has already been damaged, and is not fit for performance guarantee tests; it is the responsibility of the supplier to test the performance of the boiler and related equipment, and the appellant is required to act merely as a facilitator for the conduct of the tests; in their letter dated 27.03.2017 the first respondent stated that coal was heterogeneous in nature, it could not exactly match the design coal, they had obtained, and were now holding sufficient quantity of the design coal and were willing to make available such design coal for the purposes of conducting the performance guarantee tests; and this was said after running the units commercially using non-design coal. On the other hand Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that the appellant has neither pleaded in the Section 9 petition, nor have they proved on the basis of any supporting document, that the contractual conditions have been complied with by them till date; the appellant has not even issued a noti....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... the other. Clause 6.3 stipulates that such arbitration shall be finally and exclusively settled in accordance with the Arbitration and Conciliation Act, 1996; and the place of arbitration shall be in Hyderabad in India. Clause 6.4 stipulates that the arbitration panel shall consist of three arbitrators; one to be appointed by the appellant and the other by the first respondent; and the two arbitrators, appointed by the parties, shall in turn jointly appoint the third arbitrator. The disputes, claims/differences arising out of any of the contracts or the coordination agreement are required, on failure of such dispute being resolved by mutual consultation and negotiation, to be resolved by an arbitral Tribunal consisting of three arbitrators. Disputes, such as whether the appellant is liable to pay liquidated damages; whether they are deemed to have achieved provisional acceptance consequent upon the first respondent having commenced commercial operations; whether the appellant's delay in completing the project, and in achieving provisional acceptance, is because of the failure of the first respondent to supply design coal; whether the delay in supply of BTG equipment by the CTC ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....nt, towards its false and disputed claim of liquidated damages; a claim for liquidated damages by a party is only a claim, and does not entitle the party to unilaterally adjust what it claims as liquidated damages from the amounts payable to the contractor; and in Gangotri Enterprises Limited (2016) 11 SCC 720 the Supreme Court, following Raman Iron Foundry (1974) 2 SCC 231, has held that, in the event the sum claimed by the beneficiary from the guarantor is in the nature of damages, which is not yet adjudicated upon in arbitration proceedings and which is not the sum admitted by the guarantor, injunction may be granted against encashment of the bank guarantee, subject to a prima-facie case being made out on merits that the guarantor has a strong ground to succeed in the arbitration or any competent forum of law. On the other hand Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that, under the EPC Contracts and the Co-ordination Agreement, the appellant is required to pay liquidated damages to the first respondent for delay in the agreed delivery schedule, and/or if the project does not achieve provisional acceptance by the ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....cient to cover the full amount recoverable, the contractor shall on demand pay to the purchaser the balance remaining due." While the respondent contended that the appellant had committed the breach, the appellant contended that it was the respondent which had committed breach of contract, and was liable to pay damages to the appellant. On being called upon to make payment, the respondent failed to do so. The respondent filed an application under the Arbitration Act before the Delhi High Court. They also sought an injunction restraining the appellant from recovering the amount, claimed by them as damages, from the pending bills of the respondent. The claim of the respondent against the appellant, and the counter-claim of the appellant against the respondent, was the subject matter of reference to arbitration. During the pendency of the arbitration some amounts became payable by the appellant in respect of the contracts entered into between the parties. Apprehending that the appellant would appropriate these amounts claimed by it, even though their claim for damages was disputed by the respondent, an application was made by the respondent requesting the Delhi High Court to restra....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....departments to withhold payment to the appellant under the subsequent contract stating that the earlier contract was cancelled, and such cancellation had resulted in a loss of more than five and half crores. The respondent also sought encashment of the bank guarantee. The appellant invoked the arbitration clause, and then moved an application under Section 9 of the 1996 Act seeking injunction against encashment of the bank guarantee, contending that the respondent had no right to encash the bank guarantee furnished by the appellant in relation to a dispute arising out of another contract. The respondent, however, contended that Clause 62(1) of the general conditions of contract enabled it to recover any dues from the appellant even if such claim was not for the "sum due" and "sum payable"; and it was a claim for damages, though disputed by the appellant, and remained to be adjudicated in a Court. The Supreme Court relied on its earlier judgment in Raman Iron Foundry5, and held that Clause 62 of the contract in issue was identical to Clause 18 of the contract in Raman Iron Foundry5 which stipulated that the amounts to be forfeited or recovered may be deducted from any moneys then....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....n Foundry5, this High Court held that any term in the agreement, that one of the parties shall be the sole Judge to quantify the same, had to be held as invalid; the liability to pay damages would arise only after it was established that there was a breach of the contract; it was for the Court or the arbitrator to decide as to who had committed the breach; and till the liability was ascertained, it could not be said that there was a "debt due or debt owing". On these grounds, this High Court rejected the contention, urged on behalf of the appellant, that it was the sole Judge to decide as to whether the contractor had committed a breach of the contract, and what was the extent of damage caused to it. This High Court further held that, in the absence of any determination by the Court or the arbitrator, no amount could be said to be payable by the respondent to the appellant by way of damages; it was, therefore, just and proper to restrain the appellant from enforcing the bank guarantees; no irretrievable injustice would be caused to the appellant as it could recover damages, from the bank and the contractor, in case it succeeded in the case; and the interest of the appellant coul....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ation advance or working funds or for due performance of the contract if the same is unconditional and if there is a stipulation in the bank guarantee that the bank should pay on demand without demur and that the beneficiary shall be the sole judge not only on the question of breach of contract but also with respect to the amount of loss or damages, the obligation of the bank would remain the same and that obligation has to be discharged in the manner provided in the bank gurantee. In General Electric Technical Services Company Inc. vs. Punj Sons (p) Ltd. (1991 (4) SCC 230) while dealing with a case of bank guarantee given for securing mobilisation advance it has been held that the right of a contractor to recover certain amounts under running bills would have no relevance to the liability of the bank under the guarantee given by it. In that case also the stipulations in the bank guarantee were that the bank had to pay on demand without demur, and the beneficiary was to be the sole judge as regards the loss or damage caused to it. This Court held that notwithstanding the dispute between the contractor and the party giving the contract, the bank was under an obligation to discharge ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....her specifically provided that the appellant would be the sole judge of, and as to, whether the respondent, a party to the contract, had committed any breach; the decision of the appellant, as to the outstanding amount due, was final and binding; the bank guarantees, furnished by the Bank to the appellant, were unconditional; the appellant was the sole judge regarding the question as to whether any breach of contract had occurred and, if so, the amount of loss to be recovered by the appellant from the respondent; the entire dispute was pending before the Arbitrator; whether and if so what was the amount due to the appellant was to be adjudicated in the arbitration proceeding; and the reasoning of the Learned Single Judge of the Calcutta High Court that, before invoking the performance guarantee, the appellant should assess the quantum of loss and damages, and mention the ascertained figure, was not a ground to restrain invocation of the bank guarantee. In Ansal Engineering Projects Limited (1996) 5 SCC 450, the appellant sought an injunction, under the Arbitration Act, 1940 to restrain the respondent from invoking the bank guarantee. The contract was for construction of resident....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....s the amount due and payable is determined by a competent court or tribunal by mere invocation of bank guarantee or letter of credit pleading that the amount is due and payable by the petitioner, which was disputed, cannot be held to be due and payable in- a case. The Court has yet to go into the question and until a finding after trial, or decision is given by a court or tribunal that amount is due and payable by the petitioner, it cannot be held to be due and payable. Therefore, the High Court committed manifest error of law in refusing to grant injunction as the petitioner has made out a prima facie Strong case. We find no force in the contention. All the clauses of the contract of the bank guarantee are to be read together. Bank guarantee/letters of credit is an independent contract between the bank and the beneficiary. It does not depend on the result of the dispute between the person on whose behalf the bank guarantee was given by the bank and the beneficiary. Though the question was not elaborately discussed, it was in sum answered by this Court in Hindustan Steel Workers Construction Ltd. v. G.S. Atwal & Co. (Engineers) Pvt. Ltd.. [1995] 6 SCC 76 at 79. This Court had held ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ld that the bank which gives the guarantee is not concerned with the relations between the supplier and the customer, nor with the question whether the supplier had performed his contractual obligation or not, nor with the question whether the supplier is in default or not; and the bank must pay according to the tenor of its guarantee on demand without proof or condition. Thereafter the Supreme Court, in Sumac International Ltd (1997) 1 SCC 568, observed: "....... Our attention was invited to a number of decisions on this issue -- among them, to Larsen & Turbro Ltd. v. Maharashtra State Electricity Board & Ors. (1995 [6] SCC 58), Hindustan Steel Workers Construction Ltd. v. G.S. Atwal & Co. (Engineers) Pvt. Ltd. (1995 [6] SCC 76) and to National Thermal Power Corporation Ltd. v. Flowmore Pvt. Ltd. & Anr. (1995 [4] SCC 515). The latest decision is in the case of State of Maharashtra & Anr. v. M/s National Construction Company, Bombay & Anr. (JT 1996 [1] SC 156) where this Court has summed up the position by stating, "The rule is well established that a bank issuing a guarantee is not concerned with the underlying contract between the parties to the contract. The duty of the....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... the first respondent invoked the jurisdiction of the Gujarat High Court which allowed the Writ Petition holding that, as there was a shift in the initial project envisaged in the letter of intent, the contention that forfeiture must follow notwithstanding any difficulty in execution of the contract could not be accepted; and the parameters, for avoiding payment of bank guarantee by the bank, could not be applied as, if the decision of the appellant to cancel the contract and to award the penalty of forfeiture was found to be erroneous and was set aside, the question of allowing the appellant to encash the bank guarantee would not arise. Aggrieved thereby the appellant carried the matter in appeal, and it is in this context that the Supreme Court observed that the bank guarantee is an independent contract between the guarantor-bank and the guarantee-appellant; the guarantee was unconditional; no doubt, the performance guarantee was against the breach by the lead promoter viz. the first respondent, but between the bank and the appellant, the specific condition incorporated in the bank guarantee was that the decision of the appellant, as to the breach, was binding on the bank; and th....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....2 SCC 231 , was later set aside by the Supreme Court, in Tarapore & Co. (1996) 5 SCC 34, holding that the bank guarantee was an independent and distinct contract, and was not qualified by the underlying transaction or the validity of the primary contract between the person at whose instance the bank guarantee was given and the beneficiary; what the High Court had observed would apply only to the parties to the underlying transaction or to the primary contract, but could have no relevance to the bank guarantee given by the bank, as the transactions between the bank and the beneficiary were independent, and of a different nature; and in the case of an unconditional bank guarantee, the nature of obligation of the bank was absolute, and was not dependent upon any dispute or proceeding between the party, at whose instance the bank guarantee was given, and the beneficiary. A similar view has been taken in the subsequent judgment of the Supreme Court in G.S. Atwal & Co. (Engineers) Pvt. Ltd. (1995) 6 SCC 76 Ansal Engineering Projects Ltd. (1996) 5 SCC 450; Sumac International Ltd., (1997) 1 SCC 568; and Gujarat Maritime Board (2016) 10 SCC 46 = MANUPATRA/SC/1105/2016. Reliance placed, ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e making the beneficiary the sole judge on the question of breach of contract and the extent of loss or damages would be invalid, and no amount can be said to be due till an adjudication in that behalf is made either by a court or a arbitrator, would be applicable only to the parties to the underlying transaction or the primary contract, but can have no relevance to the bank guarantee given by the bank, as the transaction between the bank and the beneficiary is independent and of a different nature. In the case of an unconditional bank guarantee, the nature of obligation of the bank is absolute and not dependent upon any dispute or proceeding between the party at whose instance the bank guarantee is given and the beneficiary. (Tarapore & Co. (1996) 5 SCC 34 ; G.S. Atwal & Co. (Engineers) Pvt. Ltd.18; Ansal Engineering Projects Ltd. (1996) 5 SCC 450). Where the bank gurantee is irrevocable and unconditional, and the beneficiary is made the sole judge on the question of breach of performance of the contract and the extent of loss or damages, an injunction restraining the beneficiary from invoking the bank guarantees cannot be granted. (Tarapore & Co. (1996) 5 SCC 34; Larsen and To....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ould submit that, if their claim was genuine, the first respondent would have imposed liquidated damages in the monthly bills of the appellant as required under the contracts; two days after commencement of commercial operations of Unit-II, the first respondent made a false claim for liquidated damages for the alleged delay in execution of the works by the appellant; this conduct is fraudulent, and a false claim is made only to avoid making payment of the amounts legitimately due to the appellant, and to encash the performance guarantees illegally; and the first respondent has simultaneously claimed liquidated damages from the appellant and CTC, though the entire delay is attributable to CTC alone. On the other hand Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that the delay liquidated damages are claimed under two contracts which are neither inter-linked/connected nor dependent on each other; the quantum of damages has been calculated on the basis of different contract prices, and different number of days of delay in completing separate works; and the appellant has not established fraud, much less a fraud in relation to ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....the appellant. We have no manner of doubt that the bald assertion of fraud had been made solely with a view to obtain an order of injunction. In the absence of established fraud and not a mere allegation of fraud and that also having been made only in the injunction application, the court could not, in the present case, have granted an injunction relating to the encashment of the bank guarantees.............." (emphasis supplied) Pleadings are only allegations or averment of facts. Mere pleading do not make a strong case of prima facie fraud. The material and evidence has to show it. (Svenska Handelsbanken (1994) 1 SCC 502). A mere allegation in the pleadings that the contractee, fraudulently, invoked the bank guarantee would not amount to establishing clear fraud or fraud of an egregious nature. (Techtrans Construction India Pvt Ltd & Ksheeraabad Constructions Pvt. Ltd. 2015 (1) ALT 275 (DB); Himadri Chemicals Industries Limited (2007) 8 SCC 110). Fraud, like any other charge of a criminal offence whether made in civil or criminal proceedings, must be established beyond reasonable doubt. A finding as to fraud cannot be based on suspicion and conjecture. (Svenska Handelsbanken (....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....f the fraud that the Courts talk about is fraud of an "egregious nature as to vitiate the entire underlying transaction". (Edward Owen Engineering Ltd. [1978] 1 All E.R. 976; Singh Consultants and Engineers (P) Ltd. (1988) 1 SCC 174). The fraud perpetrated would be of an egregious nature when it is of a gross nature which shakes the conscience of the Court, and the said fraud is known to the parties, including the party representing as well as the bank. (Bhandari Engineers and Builders Pvt. Ltd. v. Vijaya Bank 168 (2010) DLT 47 = MANU/DE/0120/2010). The Court would be slow in granting an order of injunction, restraining realisation of a bank guarantee, except when it is clearly shown that a fraud of a grievous nature has been committed and to the notice of the Bank. (Millenium Wires (P) Ltd. 2015 (4) SCALE 62; ICICI Bank Ltd 2015 (6) ALD 486 (DB)). Commission of fraud must be confined to acts committed by a party to a contract with the intention to deceive another party or to induce him to enter into a contract. Fraud, which vitiates the contract, must have a nexus with the acts of the parties prior to entering into the contract. Subsequent breach of contract on the part of a pa....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ter be made, will be clearly fraudulent. The duty cast on the bank to make payment on demand is in terms of the bank guarantee itself, and is not related to the underlying contract between the person at whose behest the bank guarantee was furnished and the beneficiary. Further the fraud must be of an egregious nature which shocks the conscience of the Court. Such fraud must be known to the parties and to the bank. The appellant does not allege fraud on the part of the first respondent in obtaining the bank guarantee. Their entire case is founded on the allegation that the first respondent made a false claim for liquidated damages in execution of the works by the appellants two days after the commencement of commercial operations of Unit II, and such a false claim was made only to avoid making payment of the amounts due to the appellant, and to illegally encash the bank guarantee. The appellant alleges fraud because the first respondent's claim for liquidated damages is contrary to the terms of the underlying contract. The amounts which the appellant claims as due to them is also based on their claim of having performed their obligations under the primary contracts. It is not eve....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....d pending the decision of the Arbitral Tribunal; and the appellant would not be able to recover damages from the first respondent as all the assets of the first respondent have been mortgaged to its secured creditors, it has been suffering abnormally escalating losses, etc. Learned Senior Counsel would also submit that the appellant would not be able to recover the said monies from the first respondent even if they succeed before the arbitral tribunal; the Director's Report, of the first respondent for the year 2015- 2016, establishes that the first respondent made a loss of Rs.15.48 crores for the year ending 31.03.2015, and by the year ending 31.03.2016 the losses jumped to more than Rs.42.76 crores; the audited Balance Sheet of the first respondent for the year 2016- 2017, as e-mailed by the officer of the first respondent upon the request of their shareholder, establishes that the first respondent has suffered losses of around Rs. 328.46 Crores during the Financial Year 2016-17; the accumulated losses of the first respondent, for the three years 2014-15 to 2016-17, exceed Rs.386.49 Crores; it is clear that they have been supplying electricity incurring huge losses, and the l....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....r damages in close reference to the facts of the present case; and the appellant herein is substantially relying on the exceptions relating to special equities and irretrievable damage that would be caused to the appellant in the event illegal encashment of the bank guarantees are permitted. On the other hand Sri C.V. Mohan Reddy, Learned Senior Counsel appearing on behalf of the first respondent, would submit that no case of irretrievable/irreparable injury was pleaded, or established. by the appellant to seek an injunction against encashment of the Bank Guarantees; the nature of irretrievable injury, required to be established in the case of bank guarantees, must be of the nature referred to in Itek Corporation v. First National Bank of Boston 566 F. Supp.1210 (1983). ; in the present case, admittedly, the facility is into commercial operation and is generating revenue; the appellant has an adequate remedy available in law, in the form of arbitration, to recover its dues, if any, from the first respondent; the first respondent's parent company i.e Sembcorp Utilities Pvte. Limited has extended its Corporate Guarantee (to the tune of Rs. 7604 Crores) as part of the overall secur....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

...., as evidenced by the issuance of the provisional acceptance certificate by the first respondent; the appellant has deliberately not mentioned that payment, under the EPC Contracts, were progressive in nature and dependant on completion of the respective milestones; payment, which was to become due upon successful completion of the milestone of provisional acceptance, has not become due as on date since provisional acceptance has not been achieved by the appellant; since the conditions stipulated in Article 6.3 has not been satisfied, and provisional acceptance has not been achieved as on date, the said amount is not payable to the appellant; the amounts, mentioned in the first respondent's letter dated February 02, 2017, are not retention amounts, but milestone payments which are to be paid only upon successful completion of the milestone of provisional acceptance test, and not otherwise; and the same ought not to be treated as an admission of outstanding liability by the first respondent to the appellant. In Gammon-OJSC Mosmetrostroy JV v. Chennai Metro Rail Limited MANU/TN/2876/2015 (Mad) = 2015(6) ARBLR 340 , the Madras High Court held:- ".............It is claimed ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....rce and staying the same would revive the party to their original position. Further, it is a matter of fact that already the CMRL has invoked two bank guarantees which are the subject matter in other two applications in Application Nos. 730 & 733 of 2015. As the Bank Guarantees have been invoked in those matters, those applications were dismissed by this Court on 07.08.2015............. .............Admittedly, the Bank Guarantees given by the applicant are alive and the CMRL can at any time, invoke the same. Therefore, the interest of the CMRL is well protected by the Bank Guarantees furnished by the applicant. If those Bank guarantees are continued to be alive during the arbitral proceedings and even thereafter, during the pendency of the proceedings under Section 34 of the said Act, the interest of the CMRL is in no way be affected or prejudiced. On the other hand, if the Bank guarantees are invoked in the mean time, certainly, the applicant would be put to great financial strain as the concerned Banks which had given Bank Guarantee would ultimately, bounce upon the applicant to pay the money. In my considered view, this would certainly make the applicant to suffer even....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....owed to encash the bank guarantee in question, it would amount to irretrievable injustice to the plaintiff. I am, Therefore, satisfied that it is a fit case where defendant No.1 needs being interdicted from encashing the bank guarantee in question........." (emphasis supplied). In Hindustan Construction Co. Ltd. (1999) 8 SCC 436, the Supreme Court held:- "..............We have scrutinised the facts pleaded by the parties in respect of both the bank guarantees as also the documents filed before us and we are, prima facie, of the opinion that the lapse was on the part of the defendants who were not possessed of sufficient funds for completion of the work. The allegation of the defendants that HCCL itself had abandoned the work does not, prima facie, appear to be correct and it is for this reason that we are of the positive view that the "special equities" are wholly in favour of HCCL............" (emphasis supplied) In Universal Publishers Pvt. Ltd. v. Australian Executor Trustees Limited (2013) NSWSC 2021, the Supreme Court of New Southwales held:- ".............According to AET's audited accounts for the year ended 30 June 2013, it had net assets of $33,029.....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....on advance for procuring material for being used on the defendant's building as per the approved specification; and these factors constituted special equities in favour of the plaintiff. In Hindustan Construction Company Ltd (1999) 8 SCC 436 , the Supreme Court was, prima facie, of the opinion that the defendants did not possess sufficient funds for completion of the work; their allegation that the appellant had abandoned the work did not, prima facie, appear to be correct; and they were of the view that special equities were wholly in favour of the appellant. As noted hereinabove, the Supreme Court, in Hindustan Construction Company Ltd (1999) 8 SCC 436 , was satisfied that the subject bank guarantees were neither unconditional nor unequivocal. As the Supreme Court was satisfied that invocation of bank guarantee was subject to fulfillment of certain conditions in the underlying contract, it took note of the dispute between the parties, under the said contract, to examine whether there were special equities in favour of the appellant. In Universal Publishers Pvt. Ltd (2013) NSWSC 2021, the Supreme Court of New South Wales observed that the respondent would not be able to meet....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... as would override the terms of the guarantee, and the adverse effect of such an injunction on commercial dealings in the country. (Dwarikesh Sugar Industries Ltd. 1997) 6 SCC 450; Svenska Handelsbanken 1994) 1 SCC 502; Larsen & Toubro Ltd. (1995) 6 SCC 68; G.S. Atwal & Co. (Engineers) (P) Ltd. (1995) 6 SCC 76 and Sumac International Ltd. (1997) 1 SCC 568). A mere apprehension, that the other party will not be able to pay, is not enough. (Sumac International Ltd (1997) 1 SCC 568; Singh Consultants and Engineers (P) Ltd. (1988) 1 SCC 174). For irretrievable injury to result, the circumstance must be such which would make it impossible for the guarantor to reimburse himself, if he ultimately succeeds, or when irretrievable harm or injustice, to one of the parties concerned, has resulted. This should be decisively established, and it must be proved to the satisfaction of the Court that there would be no possibility, whatsoever, of recovery of the amount from the beneficiary, by way of restitution. (Dwarikesh Sugar Industries Ltd. (1997) 6 SCC 450; Millenium Wires (P) Ltd. 2015 (4) SCALE 62; ICICI Bank Ltd 2015 (6) ALD 486 (DB)). The question, which necessitates examination, is w....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....rican Government cancelled the export licences in relation to Iran, and the Iranian Government had forcibly taken 52 American citizens as hostages. The US Government had blocked all Iranian assets under the jurisdiction of the United States, and had cancelled the export contract. The Court upheld the contention of the exporter that any claim for damages against the purchaser, if decreed by the American Courts, would not be executable in Iran under these circumstances; and realisation of the bank guarantee/letters of credit would cause irreparable harm to the plaintiff. (Sumac International Ltd. (1997) 1 SCC 568; Singh Consultants and Engineers (P) Ltd. (1988) 1 SCC 174 ). The exceptional circumstances which make it impossible for the guarantor to reimburse himself, if he ultimately succeeds, should be decisively established, and a mere apprehension, that the other party will not be able to pay, is not enough. In Itek, there was certainty on this issue and there was good reason in that case for the Court to be, prima facie, satisfied that the guarantors i.e. the bank and its customer would be found entitled to receive the amount paid under the guarantee. In the cases on hand the ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ere to proceed on the premise that the first respondent has, in fact, suffered losses in excess of Rs.326.5 Crores, and its assets are mortgaged to the bank as security for the loans extended to them in excess of Rs.6,000 Crores, we cannot also ignore the first respondent's claim that their holding company (which owns more than 88% shares of the first respondent) has furnished corporate guarantees for a sum in excess of Rs.7,500 Crores and has, in addition, infused Rs.4,340 Crores into the first respondent, among others, to support its cash flows. As in the case of Sumac International (1997) 1 SCC 568, no material has been placed by the appellant to show that the first respondent would not, under any circumstances, be in a position to repay the amount, received by them on encashment of the bank guarantees, in case the appellant were to succeed in the arbitration proceedings later. Unlike in Itek Corporation 566 F. Supp.1210 (1983)., where there was no possibility whatsoever of recovering any amounts from the other party, the extent of support extended to the first respondent by its parent company shows that the appellant's apprehension, to the contrary, is unfounded. The appellant'....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....has admitted that the slow pace of commissioning activities on Unit-2 is likely to further delay the PAT (Provisional Acceptance Test). As on November 18, 2016, provisional acceptance of Unit - II was, admittedly, not achieved. In their letter dated January 02, 2017, the appellant admits that they are likely to achieve PAT by 31st March, 2017. A tripartite discussion was held on February 22, 2017 between the appellant, the first respondent and the CTC to decide on the action plan to achieve provisional acceptance of Unit- I. It does appear, from these documents, that provisional acceptance of Units 1 and 2 were not achieved till the jurisdiction of the Commercial Court was invoked by the appellant on 06.03.2017. It does appear that their plea, in the petition filed by them under Section 9 of the 1996 Act, that provisional acceptance was achieved for Unit - I on 25.05.2016, and for Unit II on 02.02.2017, are false. It is the duty of a party seeking injunction to bring to the notice of the Court all facts material to the determination of his right to that injunction; and it is no excuse for him to say that he was not aware of the importance of any facts which he has omitted to bri....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....supposed to know the law. But it knows nothing about the facts, and the applicant must state fully and fairly the facts, and the penalty by which the Court enforces that obligation is that, if it finds out that the facts have not been fully and fairly stated to it, the Court will set aside any action which it has taken on the faith of the imperfect statement. (Amar Singh 2011) 7 SCC 69; R. v. Kensington Income Tax Commr., ex p Princess de Polignac (1917) 1 KB 486 (CA)). Suppression of facts by the party against the beneficiary, and prima facie evidence to show that there is truth in these allegations, would not entitle the party to seek injunction restraining invocation of the bank guarantee. (Synthetic Foams Ltd  MANU/DE/0214/1987: AIR 1988 Delhi 2007 and Satluj Jal Nigam Ltd. AIR 2006 Delhi 169 ; State Trading Corporation of India Ltd. 200 (2013) DLT 289 = MANU/DE/1273/2013 ). While the ex facie false plea, of having already achieved provisional acceptance, in the Section 9 petition filed by the appellant, would have, by itself, necessitated denying them any relief, and in non-suiting them on this short ground, we have examined their claim on merits, including that the in....