2007 (8) TMI 297
X X X X Extracts X X X X
X X X X Extracts X X X X
....i, SDR, for the Appellant. None, for the respondent. [Order per: Archana Wadhwa, Member (J)] - Being aggrieved with the order passed by the Commissioner (Appeals), the Revenue has preferred the present appeal. We have heard Shri D.S. Negi, learned SDR for the Revenue. Nobody appeared for the respondent. 2. The respondents were awarded a contract for design, detailed engineering, pro....
X X X X Extracts X X X X
X X X X Extracts X X X X
....lauses of the contract and held that the lump sum price mentioned in the contract includes the cost of all items included in the scope of work, technical specification, specific requirements, drawing and/or under any other heads of contract documents and to complete the subject work on turnkey basis, irrespective of whether all the items for supply and erection are categorically listed out/brought....
TaxTMI