UPS System Contract with DMRC Not a Works Contract u/s 2(119) of CGST Act.
X X X X Extracts X X X X
X X X X Extracts X X X X
....Supply of Works Contract or not - Composite Contract - the contract entered into with DMRC for supply, erection, installation, commissioning and testing of UPS system do not qualify as a supply of works contract under Section 2(119) of the CGST Act.....




TaxTMI
TaxTMI