Just a moment...

Top
Help
AI Drafter - (New and Powerful)

TaxTMI AI Drafter workflow from input facts to final legal draft Generate professional replies, appeals, opinions to Show Cause Notices, assessment orders, audit objections, and other legal communications using TaxTMI's AI Drafter.

Try Now
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

2017 (8) TMI 737

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....assessee company is a non resident company incorporated in Germany. Is business consists inter alia of manufacturing of mining equipments and operating mines and it has implemented a number of projects in which both the equipment and operational support was provided. The Singareni Colleries Company limited, (hereinafter referred to as SCCL), an Indian Company, decided to introduce "Continuous Miner Technology (CMT) for extraction of developed pillar GDK-11A Incline in the Ramagundam area of Andhra Pradesh for increased production and mining safety. Accordingly, on 14.11.2005, SCCL floated a single tender along with tender notices in Vol. I & II for introduction of CMT with 5 years maintenance contract in SCCL Mines. The assessee applied for the bid as a single bidder on 29.03.2006 and 3.04.2006 by submitting a single bid document in two parts i.e. cover (A) for Technical Bid and cover (B) for Commercial Bid which also contains Price Bid as cover (C). SCCL, in its tender documents, had specified the scope of work to include "design, supply, installation, commissioning and operation & maintenance (O&M) for 5 years on contract including initial warranty period and handing over of the ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ical bid and the other for commercial bid as a total service provider for accomplishment of contract in accordance with all the provisions of bid documents, which was accepted by SCCL. The technical personnel of the assessee have visited India not once but several times, to negotiate the terms and conditions of the contract and to integrate the subsequent level of activities for successful completion of the project. Thus, AO was of the opinion that the whole project was one single composite, continuous and inseparable project which has been fragmented into separate activity module. The AO also observed that the assessee, while providing all the technical details in its technical bid document in cover A for the implementation of full 'scope of supply' works of SCCL, has stipulated that (i) The contract No.1, should come into force immediately upon signing the contract, (ii) The Contract No.2 and 3 should come into force upon receipt of the DGMS Mining method Approval. Thus, though all the three contracts are inter-linked and are indivisible, the assessee has stipulated the conditions of artificially separating these continuous project activities into 3 separate ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....Indian activities. The AO observed that from the contract III, the assessee has shown a loss of Rs. 3,69,82,963/- as per the P&L Account and after verification accepted the same observing that some of the some of the manpower expenses pertains to a period prior to commencement of the installation and operation & maintenance activities as per contract III. He accordingly computed the taxable income of the year and proposed the draft assessment order. Aggrieved, assessee preferred its objections before the DRP. DRP also confirmed the view of the AO but, apportioned 35% of the contract II receipts towards Indian Operations and enhanced the allowable expenses to 50%. The AO, accordingly passed the final assessment order. Against the final assessment order, the assessee is in appeal before us by raising the following grounds of appeal: "1. On the facts and circumstances of the case and in law, the learned AO has erred in assessing the total business income of the Appellant at Rs. 20,403,492 as against total business loss of Rs. 36,982,963 computed by the Appellant; 2. On the facts and in the circumstances of the case, the Ld. AO has erred in law in alleging that intent....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....taxation in India. Without prejudice, on the facts and in the circumstances of the case and in law, the Ld. AO has failed to appreciate the fact Project Office in India has no role with supply of equipment and accordingly, income from offshore supply of equipment cannot be taxed in India. 11. On the facts and circumstances of the case, the Ld. AO has erred in stating that Appellant has not cooperated during the assessment proceedings and has compelled the Ld. AO to call for the information under section 133(6) of the Act. The Ld. AO has not appreciated the facts that details requested from the Project Office is not available at that time and therefore Project Office took time to collate the relevant information from the head office. 12. Without prejudice, assuming but not accepting that income from offshore supply is effectively connected with business connection in India, erred in alleging that the total profits from offshore supply was 50% of gross revenue of offshore supply and in attributing 35% thereof to India, even though no part of the activity relating to offshore supply was carried out by Appellant's Project Office in India. 13. On ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....le as business income of the assessee and since there was no permanent establishment (P.E) in India during the relevant period, the income cannot be brought to tax either under the Income Tax Act or the India Germany DTAA. Further, she also drew our attention to Article 5(d) of the DTAA to submit that a P.E is constituted only if the employees of the assessee were in India for a minimum of six months but since even SCCL letter clearly mentions only 37 days, there was no P.E in India. She also drew our attention to the fact that under article 29 of the DTAA, the equipment supplied by the Head Office is outside the scope of business income of the Assessee. 11. The learned Counsel for the assessee also submitted that as per the terms of the contract (ii), the tax burden if any, arises on this contract, it is to be borne by SCCL. Therefore, according to her, there was no incentive for the assessee to avoid tax by splitting the alleged composite contract into three different contracts. In support of all the above contentions, the learned Counsel for the assessee placed reliance upon the following case laws: (a) Ishikawajima-Harima Heavy Industries Ltd vs. DIT (2007)288 ITR 4....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....act of the other two contracts and hence should be held guilty of suppression of material facts and adverse inference should be drawn against it. (ii) That the contract was composite and non-separable as the responsibility of the bidder included conducting of scientific site investigations, obtaining DGMS approvals, supplying continuous mines and other equipment, operation and maintenance of the equipment for a period of five years with a guarantee for an average production of 1350 tonnes per day and 0.40 million tonnes per year. Thus, though the contract apparently contained separate activities, but it was to be single contract with a single deliverance, i.e. ' Annual Guaranteed Production'. As this overarching scheme of the contract was not abrogated by the parties, it continued to be the essence of the contract. The commitment of Annual Guaranteed Production presupposes combined commitment of supply of equipment, installation and commissioning, operation and maintenance because neither of them, by itself, could guarantee annual production and therefore the contract is a composite one. Even though, the contract is split into three, the success or failure of each contract....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....equipment per se and 'supply' took place partly in India. Even the term 'supply' took place partly in India. Even the term 'supply' included the stage up to installation and commissioning of the plant. Therefore, the paper arrangement showing delivery off-shore did not amount to real delivery and there was never a real transaction for sale of the goods. 14. In support of the above contentions, the learned DR relied upon the following decisions: (a) Ansaldo Energia SPA Vc Income Tax Appellate Tribunal(2009) 310 ITR 237 (b) Linde AG, Linde Engineering Division (AAR No.962 of 2010) dated 20.03.2012. (c) Vodafone International Holdings BV Netherlands vs. VOI (345 ITR 1 (S.C) (d) Dongfang Electric Corporation vs. Dy. Director of Income Tax, (International Taxation) (2012) 147 TTJ 579 (Kolkata). 15. Having regard to the rival contentions and the material on record, the following questions emerge for adjudication: (i) Whether all the three contracts are interlinked interdependent and indivisible and therefore whether they are to be considered as a single and a composite contract? (ii) Whether there was a PE of the assessee in Ind....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....equipment to SCCL for smooth and successful execution and operation of the project. The technical document of the tender starts from page 269 of the paper book and at page 279 is clause No.23 specifying the bidder responsibility as per which the relevant responsibilities are as under: 1) Shall conduct scientific site investigations, prepare study reports, obtain DGMS approval for the mining method/ technology and shall quote for these. 2) Shall supply continuous Miner, shuttle cars, Multi Roof Bolter, Mobile feeder breaker J & complete electrical equipment as one package and shall quote for these in detail for each individual item. The bidder shall quote for 2 Nos. of shuttle cars/Coal Haulers with 15 Tonne pay/load capacity or 3 Nos. of shuttle cars with 10.0 Tonne pay load capacity. (To quote for both options). 3) Shall operate and maintain the equipment with required spares and consumables for a period of 5 (five) years and to quote separately for spares and services on per tonne basis, year-wise. Note: The contract for supply, operation & maintenance of the equipment will come into force after the DGMS approvals for the scientific si....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....vices - Spare Parts on a USD/tone Basis * Maintenance Services - Consumables on a USD/tone Basis The full "Scope of Supply" for the above proposed contracts is detailed in "Cover A Technical Volume" of this Bid. All contracts are signed simultaneously, however: * Contract NO.1 above comes into force immediately upon signing the contract. * Contracts NO.2 and No.3 come into force upon receipt of the DGMS Mining Method Approval". 19. At page 421 of the paper book is the specimen copy of the price bid submitted by the assessee in cover-C and in accordance with this bid, the assessee has divided the whole contract into three different contracts and has also apportioned the payment accordingly. Further, from the Errata issued by SCCL which is placed at Page 362 to 376 of the paper book, we find that as per the original tender document, the contract for supply portion and maintenance of the equipment will come into force after DGMS approval for the scientific site investigation/mining method/technology is obtained but as per the amended document, there can be 3 separate contracts for (i) scientific site investigation (ii) supply of equipment and (iii) mainte....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ction 1 of this contract. Clause 34 of the contract reads as under: "34. COMING INTO FORCE OF THE CONTRACT 34.1 The contract shall come into force upon fulfilling all the following: (a) Signing of the contract by all the parties; (b) Receipt of all DGMS approvals under clause 3.1, 3.2, 3.3 of General Conditions. (c) Sanction from Govt. of India and RBI (d) Letter of indicative support for the Contract from a first class Indian Bank/Financial Institution as per Annexure IV. 34.2 In the event the contract does not come into force within nine (9) months from the date of signing of the Contract, either party may withdraw from the contract without any obligation there under". 21. Further, clause 3 of section-I of the contract-II, RC-223 provides that for the introduction of the Continuous Miner mining system in GDK-11A Mines of SCCL, DGMS approval for the mining method would be obtained by the SCCL and scientific investigation (scientific site investigation and obtaining DGMS approval) to be carried out for securing DGMS approval would be part of a separate contract to be awarded by SCCL and that the results of scientific....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....dling and storage. It shall also book shipping space in a Vessel on behalf of the SCCL and shall arrange the shipment of goods to reach their port of destination according to the time schedule mentioned in the contract. All costs of packaging, internal transportation, fees of forwarding agents, warehousing charges, port charges, dock and harbor dues and all other expenses as may be incurred for the purpose and up to the point of delivery of the goods on board the nominated ship shall be paid by the DBT and the DBT shall be liable for all expenses, including dead and extra freight, demurrage of vessels etc, arising from delay in shipment due to lack of shipping opportunities, or delay in providing documents, which are for any cause attributable to the DBT and it is also agreed that the risk of the goods shall remain with DBT until delivery has been effected free on board (FOB). 26. Clause 11 of the contract provides that SCCL shall take insurance cover for equipment on a full replacement cost basis from FOB, port of shipment, till the time the equipment is successfully commissioned underground at the Mine Site on the basis of shipping advice given by DBT as per Clause 10 of the a....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....r. The Hon'ble Supreme court in the case of Ishikawajima Harima (cited supra) was dealing with the case of a turnkey project by a consortium in which the scope of work of each of the constituent of consortium was specified. The role of the assessee therein was to develop, design, engineer and procure equipment, material and supplies, to erect and construct storage tanks of 5 MMTPA capacity, with potential expansion to 10 MMTPA capacity at the specified temperatures. Thus, the activities of the assesse involved both off-shore supply, offshore services and on shore supply and services. The contention of the revenue before the Hon'ble Supreme Court was that the contract being a composite and integrated one, the assessee was liable to tax on the offshore supply and services also. The Hon'ble Supreme Court has held that A contract must be construed keeping in view the intention of the parties. Even in the case before us, though SCCL had issued a single tender document for whole of the project, the intention of the assessee to segregate the contract into three contracts was clear from the beginning. It negotiated with SCCL who ultimately agreed to execute three separate contracts with sp....