Just a moment...

Top
Help
AI OCR

Convert scanned orders, printed notices, PDFs and images into clean, searchable, editable text within seconds. Starting at 2 Credits/page

Try Now
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

CAPACITY DETERMINATION - (REVISED 2024)

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....lity for producing goods or providing services by an entity. 1.2 This standard deals with the principles and methods of classification and determination of capacity of an entity for ascertainment of the cost of product or service, and the presentation and disclosure in cost statements. 2. Objective The objective of this standard is to bring uniformity and consistency in the principles and methods of determination of capacity with reasonable accuracy. 3. Scope This standard shall be applied to the cost statements, including those requiring attestation, which require determination of capacity for assignment of overheads. The standard may be applied for determination of capacity for any other purpose. 4. Definitions ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... machine has a lower processing capacity as compared to the machines before and after it in the production line. As a result this machine becomes overwhelmed with work, causing a backlog of items waiting to be processed, slowing down the entire production process, and potentially delaying the delivery of finished products to customers. 4.4 Excess Capacity Utilization: is the difference between installed capacity and the actual capacity utilization when actual capacity utilization is more than installed capacity. 4.5 Idle Capacity: is the difference between installed capacity and the actual capacity utilization when actual capacity utilization is less than installed capacity. 4.6 Installed capacity: is the maximum ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....tion while determining the Installed capacity. 5.3 Achievable or Practical Capacity: Achievable or Practical Capacity is determined after suitable adjustments to the Installed Capacity. i) Time lost due to scheduled preventive or planned maintenance ii) Number of shifts or machine hours or man hours. iii) Holidays and Weekly Offs, normal shut down days, normal idle time, iv) Normal time lost in batch change over, setup, etc. v) Loss in efficiency due to ageing of the machines/ equipment vi) Any other normal Internal Factor 5.4 Reassessment of Installed Capacity: Installed capacity shall be reassessed in case of any change due to addition, deletion, modification or for a....