Just a moment...

Top
Help
AI Drafter - (New and Powerful)

TaxTMI AI Drafter workflow from input facts to final legal draft Generate professional replies, appeals, opinions to Show Cause Notices, assessment orders, audit objections, and other legal communications using TaxTMI's AI Drafter.

Try Now
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

SEZ - AUTHORIZED ACTIVITIES WHICH CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....EZ - AUTHORIZED ACTIVITIES WHICH CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION <br>News and Press Release<br>Dated:- 2-8-2009<br><BR>Instruction no. 20 has been issued to clarify the activities that CAN BE UNDERTAKEN BY THE DEVELOPER / APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION. Since a time gap exists between the date of not....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ification and actual approval of the authorized operations by the Board of Approval, to avoid delays in the project implementation, the authorized activities were approved by the Board of Approval as default operations which may be carried out by the Developer or Co-Developer, as the case may be, after the SEZ is notified. The list of default activities has been given to annexure to the instructi....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....on. The list of authorized operations are as under: (A) Information Technology/Information Technology Enabled Services, Biotechnology and Gems and Jewellery Special Economic Zone: 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewag....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....e and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary sub-stations of appropriate capacity, pipeline network etc. 5. Telecom and other communications facilities including internet connectivity 6. Rain water harvesting plant 7. Air c....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....onditioning of processing area 8. Fire protection system with sprinklers, fire and smoke detectors 9. Landscaping and water bodies 10. Boundary wall 11. Built up processing area not less than minimum prescribed 1 lakh sq. m. 12. Office space for Customs and Security staff not exceeding 500 sq.m. (B) Sector Specific Special Economic Zones 1. Roads with Street lighting, Signals and Signage 2....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

..... Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appr....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....opriate capacity, pipeline network etc. 5. Effluent treatment plant and pipelines and other infrastructure for Effluent treatment. 6. Telecom and other communications facilities including internet connectivity 7. Rain water harvesting plant 8. Landscaping and water bodies 9. Wi Fi and / or Wi max Services 10. Drip and Micro irrigation systems. 11. Boundary wall 12. Factory sheds in process....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ing area 13. Office space for Customs and Security staff not exceeding 500 sq.m. (C) Multi Product Special Economic Zones 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to source), sewage lines, storm water drains and water channels of appropriate capacity. 3. Sewage and garbage disposal plant, pipelines and other necessary ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....infrastructure for sewage and garbage disposal, Sewage treatment plants 4. Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc. 5. Effluent treatment plant and pipelines and other infrastructure for Effluent treatment. 6. Play ground 7. Landscaping and water bodies 8. Wi Fi and / or Wi max Services 9. Dr....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ip and Micro irrigation systems. 10. Boundary wall 11. Factory sheds 12. Office space for Customs and Security staff not exceeding 500 sq.m. See: Instruction no. 20<BR> News - Press release - PIB....