Regarding the withdrawal of duty exemption in respect of goods required for initial setting up or substantial of Mega/ Ultra mega power projects.
X X X X Extracts X X X X
X X X X Extracts X X X X
.... to do, hereby makes the following further amendments in the notification of the Government of India, in the Ministry of Finance (Department of Revenue), No. 12/2012-Central Excise, dated the 17^th March, 2012, published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (i), vide number G.S.R. 163(E), dated the 17^th March, 2012, namely:- In the said notification, - (A) in the Table, (i) against Sl. No. 337, in the entries under column (3), for the words "required for setting up of an ultra-mega power project", the words and figures "required for setting up of an ultra-mega power project specified in List 10," shall be substituted; (ii) against S. No. 338, in the entries under column (3), for the words....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... 5x800= 4000 MW 7 Cheyyur UMPP,- 5x800= 4000MW List 11 (See S. No. 338 of the Table) 1 Parbati-II, Himachal Pradesh - 4x200=800 MW (NHPC) 2 Teesta- V, Sikkim - 3x170=510 MW (NHPC) 3 Sipat-II, Chhattisgarh - 2x500=1000 MW (NTPC) 4 Vindhyachal-III, Madhya Pradesh - 2x500=1000 MW (NTPC) 5 Talcher-II, Orissa - 4x500=2000 MW (NTPC) 6 Rihand-II, Uttar Pradesh - 2x500=1000 MW (NTPC) 7 Sipat-I, Chhattisgarh - 3x660=1980 MW (NTPC) 8 Kahalgaon-II Phase-I....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... Vallur Stage- I Phase I & II, Tamil Nadu - 3 x 500=1500 MW (NTPC-Tamil Nadu Energy Co. Ltd.) 28 Raghunathpur TPS Phase 1, West Bengal - 2 x 600=1200 MW (DVC) 29 Tanda- II, Uttar Pradesh-2 x 660=1320 MW (NTPC) 30 Meja, Uttar Pradesh - 2 x 660=1320 MW (NTPC) 31 Vindhyachal-IV, Madhya Pradesh - 2 x 500=1000 MW (NTPC) 32 Solapur STPP, Maharashtra - 2x660=1320 MW (NTPC) 33 Nabinagar STPP, JV with Bihar, Bihar-3x660=1980 MW (NTPC) 34 Mouda STPP-II, Maharashtra- 2x660= 1320 MW (NTPC) 35 Raghunath....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... (APPDCL) 53 Chandrapur Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL) 54 Koradi Expansion, Maharashtra- 3x660= 1980 MW (MSPGCL) 55 Bhusawal Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL) 56 Supercritical TPP at STPS Stage-V at Suratgarh, Rajasthan- 2x660)= 1320 MW (RRVUNL) 57 Supercritical TPP at Chhabra, Rajasthan - 2x660= 1320 MW (RRVUNL) 58 North Chennai, Tamil Nadu-2x600=1200 MW (TNEB) 59 Purulia Pump Storage Hydel Project, West Bengal- 4x225= 900 MW (State Sector) 60 Sagardighi TPP Ext. Unit 3&4, West Bengal....
X X X X Extracts X X X X
X X X X Extracts X X X X
....Punjab.- 3x660=1980 MW (M/s. Talwandi Sabo Power Ltd. (TSPL)) 75 TPP at Nandgaonpeth, MIDC, Amravati Dist,. Maharashtra.- 5x270= 1350 MW (M/s. Indiabulls Power Ltd.) 76 TPP at Karachhana, Allahabad, UP- 2x660 = 1320 MW (M/s. Sangam Power Gen Company Ltd.) 77 TPP at Bara, Allahabad, UP. - 3x660=1980 MW (M/s. Prayagraj Power Gen. Company Ltd.) 78 TPP at Surguja, Chhattisgarh- 2x660 = 1320 MW (M/s. IFFCO Chhattisgarh Power Ltd.) 79 TPP at Dhenkanal, Orissa- 3x350=1050 MW (M/s. GMR Kamalanga Energy Ltd.) 80 GMR Chhattishgarh Energy Ltd. Raipur, Chhattisgarh- 2x685 MW 81 &....
X X X X Extracts X X X X
X X X X Extracts X X X X
....ur, Madhya Pradesh- 2x600 MW 97 RKM Powergen Pvt. Ltd. Uchpinde TPP Janjgir- Champa, Chattisgarh- 4x360 MW 98 IL & FS Tamil Nadu Power Company Ltd. Cuddalore, Tamil Nadu- 2x600 MW 99 Meenakshi Energy Pvt. Ltd Thamminapatanam, Andhra Pradesh-Ph-1:2x 150 Ph-II 2x350 MW 100 SKS Power Generation (Chhattisgarh) Ltd. Binj Kote TPP Raigarh, Chhattisgarh- 4x300 MW 101 Jindal India Thermal Power Ltd. Angul, Orissa- 2x600 MW 102 NCC Power Projects Nellore AP- 2x660 MW 103 Samalkot Power Ltd. Samalkot, Andhra Pradesh- 2400 MW 104 Torrent Energy Ltd. Dahej, Gujarat- 1200 MW". [....
TaxTMI