Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / TMI Blogs / RSS

1997 (12) TMI 184

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... alleged that there were shortages compared to statutory accounts. It was also alleged that, based on note book recovered from transporter, that appellants had transported 18 consignments of ingots out of which only 4 consignments had been removed under the cover of gate passes. It was also found that though as per furnace specification given by the furnace manufacturers 650 units of electricity should be consumed for one M.T. ingots the electricity consumption ranged between 900 units to 1,000 units per M.T. The Collector of Central Excise on initiation of proceedings against them held that, based on consumption of electricity, they had removed substantial quantity of goods without payment of duty. 2. Arguing on behalf of the appel....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ts. 4. We have heard both sides. Collector had duly recorded that other machines are installed in factory besides furnaces where power is consumed. He has however not given any findings as to how much power such machines would need. Similarly Collector has duly recorded plea of the appellants that specifications indicated by manufacturers of furnace are only for ideal conditions. While explaining the manufacturing process of ingots, the party has stated that unless the factory is closed furnace is also to be kept cool by circulating coil of the furnaces. Scrap is first shreaded in the shreading machine and thereafter transferred to the platform. Furnace is heated end crucible fired. The scrap is manually fed in the furnace and chemi....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ent melting points. After the scrap is fed, small quantity is removed and tested in laboratory and during this period the furnace continues to consume electricity as the scrap has to be kept melting and boiling. 6. While accepting that there is force in the arguments of the party Collector has not arrived at the findings as to what precise deviation from the specifications indicated by the manufacture of furnaces would result from such conditions which do not conform to ideal conditions the furnace is expected to run on the basis of 650 units of electricity 1 M.T. norm. He has also referred to statement of Shri Mukesh Kumar of Vandhana Steel Pvt. Ltd. according to whom requirements of electricity consumption per M.T. of ingots is ab....