Audit of the builder was conducted, they made a para that they have transferred more itc then available in their stock as on 01.07.2017. On 01.07.2017 builder shown some inputs as WIP . So audit is being rejected the itc proportional to the input were WIP
is ITC of WIP was not available for trans1?
TaxTMI