Deferred Payment of Customs Duty extended to Eligible Manufacturer Importers with electronic registration and ICEGATE authentication for conditional c...
Tariff classification determines GST schedule and rate; beverages in Schedule III attract the higher rate, tea extracts and syrups in Schedule I attra...
Fraudulent trading requires cogent evidence of intent to defraud; ordinary-course payments protected, except post-insolvency withdrawals must be resto...
Natural gas supplied under the GSPA was held to be an inter-State sale concluded at Gadimoga in Andhra Pradesh, where delivery, measurement, title and risk passed to the buyer's designee; the subsequent movement through a common carrier pipeline into Uttar Pradesh was only transportation and did not convert the transaction into an intra-State sale. Co-mingling, re-metering, fungibility and processing during transit did not alter the sale's character, and Uttar Pradesh therefore lacked jurisdiction to levy VAT. Explanation 3 to Section 3 of the CST Act was treated as clarificatory, reflecting the pre-existing legal position and applying to the original scheme of the provision.
Natural gas supplied under the GSPA was held to be an inter-State sale concluded at Gadimoga in Andhra Pradesh, where delivery, measurement, title and risk passed to the buyer's designee; the subsequent movement through a common carrier pipeline into Uttar Pradesh was only transportation and did not convert the transaction into an intra-State sale. Co-mingling, re-metering, fungibility and processing during transit did not alter the sale's character, and Uttar Pradesh therefore lacked jurisdiction to levy VAT. Explanation 3 to Section 3 of the CST Act was treated as clarificatory, reflecting the pre-existing legal position and applying to the original scheme of the provision.
Note: It is a system-generated summary and is for quick reference only.