Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Section 14(1)(d) of the Insolvency and Bankruptcy Code bars a lessor from recovering leased premises during moratorium while the corporate debtor or resolution professional remains in possession, even if the lease was terminated before CIRP. The Tribunal read this protection with Regulation 31(b) and applied the distinction between physical occupation and juridical possession, holding that possession continuing after termination remains protected until lawful eviction. As the resolution professional admittedly remained in possession of the leased property, the lessor could not reclaim it during moratorium, and the claim for delivery of possession was rejected.
Section 14(1)(d) of the Insolvency and Bankruptcy Code bars a lessor from recovering leased premises during moratorium while the corporate debtor or resolution professional remains in possession, even if the lease was terminated before CIRP. The Tribunal read this protection with Regulation 31(b) and applied the distinction between physical occupation and juridical possession, holding that possession continuing after termination remains protected until lawful eviction. As the resolution professional admittedly remained in possession of the leased property, the lessor could not reclaim it during moratorium, and the claim for delivery of possession was rejected.
Note: It is a system-generated summary and is for quick reference only.