Prohibited importation of cosmetics without prior regulatory registration attracts seizure and confiscation; warehousing or re export claims do not cu...
Provisional release on security permitted where cash deposit plus bond secures differential duty; classification and treaty benefits referred for deci...
Customs Valuation Rule Sequence must be followed; single-comparator re-determination and penalties set aside without comparability or proof of mis-dec...
Separately Identifiable Services: transportation found to be the essential character, so Cargo Handling classification and extended limitation rejecte...
In a post-GST construction-linked property transaction, the Tribunal held that phrases such as construction in the post-GST period and upfront payment of the full price do not require the flat to be fully built at agreement stage or payment to be made in one lump sum. It found that where booking, allotment, contracting, construction and payment all occurred during the GST regime, the pricing already reflected the post-GST ITC position, so no separate input tax credit benefit was claimable by the buyers and no locus existed to challenge the DGAP report on that basis. On the merits, the DGAP comparison showed no incremental ITC gain and therefore no contravention of Section 171 read with Rule 129(6).
In a post-GST construction-linked property transaction, the Tribunal held that phrases such as construction in the post-GST period and upfront payment of the full price do not require the flat to be fully built at agreement stage or payment to be made in one lump sum. It found that where booking, allotment, contracting, construction and payment all occurred during the GST regime, the pricing already reflected the post-GST ITC position, so no separate input tax credit benefit was claimable by the buyers and no locus existed to challenge the DGAP report on that basis. On the merits, the DGAP comparison showed no incremental ITC gain and therefore no contravention of Section 171 read with Rule 129(6).
Note: It is a system-generated summary and is for quick reference only.