Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Manufacture / construction at site - 3.05 KMs away from the ‘site’ of the flyovers - since the said site was mentioned in the regular correspondence between N.H.A.I. and RITES Ltd. and N.H.A.I. and its engineers had full access to the site and it was near the site of construction of fly-over, benefit of exemption allowed - AT
Manufacture / construction at site - 3.05 KMs away from the ‘site’ of the flyovers - since the said site was mentioned in the regular correspondence between N.H.A.I. and RITES Ltd. and N.H.A.I. and its engineers had full access to the site and it was near the site of construction of fly-over, benefit of exemption allowed - AT
Note: It is a system-generated summary and is for quick reference only.