Data transmission equipment classification under CTSH 8517 62 remains distinct from residual classification, with exemption evidence requiring scrutin...
Manufacture / construction at site - 3.05 KMs away from the ‘site’ of the flyovers - since the said site was mentioned in the regular correspondence between N.H.A.I. and RITES Ltd. and N.H.A.I. and its engineers had full access to the site and it was near the site of construction of fly-over, benefit of exemption allowed - AT
Manufacture / construction at site - 3.05 KMs away from the ‘site’ of the flyovers - since the said site was mentioned in the regular correspondence between N.H.A.I. and RITES Ltd. and N.H.A.I. and its engineers had full access to the site and it was near the site of construction of fly-over, benefit of exemption allowed - AT
Note: It is a system-generated summary and is for quick reference only.