Political contribution deductions require assessee-specific proof before cash-back allegations can justify disallowance or unexplained-money additions...
Manufacture - The assembly of a system from various equipments as a ‘turnkey project’ may be a professional performance of a specialized contract which would not, however, render such turnkey projects to be manufactured unless the product that emerges is classifiable under one of the specific headings of the tariff - AT
Manufacture - The assembly of a system from various equipments as a ‘turnkey project’ may be a professional performance of a specialized contract which would not, however, render such turnkey projects to be manufactured unless the product that emerges is classifiable under one of the specific headings of the tariff - AT
Note: It is a system-generated summary and is for quick reference only.