1. Introduction
Environmental laws in India require industrial, infrastructural, and commercial establishments to obtain statutory permissions before beginning construction and commencing operations. These regulatory permissions—Consent to Establish (CTE) and Consent to Operate (CTO)—are issued by the State Pollution Control Boards (SPCBs) or Pollution Control Committees (PCCs) under the Water (Prevention and Control of Pollution) Act, 1974, Air (Prevention and Control of Pollution) Act, 1981, and the Environment (Protection) Act, 1986.
Together, CTE and CTO form the backbone of India's preventive environmental regulatory regime, ensuring that industries incorporate pollution control systems from the planning stage and maintain compliance throughout their operational life.
2. Legal Framework Governing CTE and CTO
The statutory basis for CTE and CTO arises from the following key legislations:
2.1 Water (Prevention & Control of Pollution) Act, 1974
- Mandates that no industry shall discharge sewage or trade effluent into water bodies without prior consent.
- Empowers SPCBs to issue CTE and CTO to regulate water pollution.
2.2 Air (Prevention & Control of Pollution) Act, 1981
- Requires prior consent for establishing or operating any industrial plant emitting air pollutants.
2.3 Environment (Protection) Act, 1986
- Acts as an umbrella law providing the central government authority to regulate all forms of environmental pollution.
- Enables SPCBs to impose stricter, activity-specific environmental conditions.
2.4 Environmental Impact Assessment (EIA) Notification, 2006
- Certain categories of industries must obtain Environmental Clearance (EC) in addition to CTE/CTO.
3. Understanding “Consent to Establish” (CTE)
CTE is the first stage approval, granted before an industry begins construction or installation of machinery.
3.1 Objectives of CTE
- To ensure the proposed site is environmentally suitable.
- To mandate pollution control systems at the design stage.
- To assess environmental impacts early in the project.
3.2 Information Typically Required for CTE
- Site and land details, including ownership/lease documents.
- Manufacturing process description and flowchart.
- List of raw materials and chemicals.
- Water requirement, effluent characteristics, and proposed treatment method.
- Air emission sources and proposed control equipment.
- Hazardous waste identification and disposal plan.
- Environmental Management Plan (EMP).
- Layout plan showing pollution control infrastructure.
3.3 CTE Validity
- Generally, 1–5 years, depending on industry category (Green, Orange, Red) and state policies.
3.4 Importance of CTE
Obtaining CTE ensures that pollution control considerations are integrated into industrial planning and that site selection aligns with regional environmental sensitivities (e.g., eco-sensitive zones, groundwater-stressed regions).
4. Understanding “Consent to Operate” (CTO)
CTO is the permit to commence commercial operations, issued only after the industry is fully constructed in compliance with the CTE conditions.
4.1 Purpose of CTO
- To verify installation and functioning of pollution control systems.
- To confirm the industry's adherence to environmental standards.
- To authorize discharge/emissions within prescribed limits.
4.2 Requirements for CTO
- Compliance report for all CTE conditions.
- Performance testing of pollution control equipment (ETP, STP, scrubbers, etc.).
- Air and water quality analysis reports from approved environmental laboratories.
- Hazardous waste authorization (if applicable).
- Records of waste disposal, manifest tracking.
- Structural/completion certificate and machinery installation proof.
4.3 CTO Validity
Under latest reforms:
- Green Category: Up to 15 years
- Orange Category: Up to 10 years
- Red Category: Up to 5 years
White category industries are exempt from CTE/CTO.
5. Categorization of Industries
Industries are classified based on the Pollution Index (PI):
- Red Category: High pollution potential
- Orange Category: Moderate pollution potential
- Green Category: Low pollution potential
- White Category: Practically non-polluting (exempted from consent mechanisms)
6. Common Conditions Imposed under CTE and CTO
6.1 Air Pollution Control
- Adequate stack height as per norms
- Filters/scrubbers/ESP installation
- DG set acoustic enclosures
- Continuous Emission Monitoring System (CEMS) for select sectors
6.2 Water Pollution Control
- Installation and operational upkeep of ETP/STP
- Zero Liquid Discharge (ZLD) for certain sectors
- Recycling of treated water
6.3 Waste Management
- Authorization under Hazardous Waste Rules, 2016
- Safe storage and transportation of waste
- Disposal through authorized recyclers/TSDF
6.4 Noise Control
- Acoustic treatment for equipment
- Compliance with ambient noise standards
6.5 Energy Efficiency and Sustainability
- Mandatory rainwater harvesting
- Green belt development
- Energy-efficient machinery and processes
7. State-Specific Requirements (Examples)
7.1 Maharashtra Pollution Control Board (MPCB)
- Mandatory online CTE/CTO applications.
- Strict norms for Red-category industries near MMR, Pune, and Nashik.
- Sector-specific guidelines for CETPs and chemical industries.
7.2 Tamil Nadu Pollution Control Board (TNPCB)
- Categorization aligned with CPCB norms but with stricter coastal zone restrictions.
- Compulsory installation of Online Continuous Effluent Monitoring Systems (OCEMS) for major water-polluting units.
7.3 Gujarat Pollution Control Board (GPCB)
- Hazardous waste management plans are stringently reviewed.
- Annual compliance reporting mandatory for many Red-category industries.
7.4 Delhi Pollution Control Committee (DPCC)
- Sensitive-zone restrictions around Yamuna floodplain.
- Ban on certain types of industries within Delhi municipal limits.
- Mandatory air quality reports due to air pollution sensitivities.
8. Application Process for CTE and CTO
Step 1: Online Application Submission
- Fill application on respective SPCB portal.
- Upload required documents, affidavits, and technical drawings.
- Pay consent fees based on capital investment.
Step 2: Scrutiny by SPCB
- Technical committee reviews emissions, effluent, waste handling, and siting criteria.
Step 3: Site Inspection
- Conducted to verify feasibility (CTE) and actual installations (CTO).
Step 4: Grant or Rejection of Consent
- Consent issued with specific operational and environmental conditions.
Step 5: Renewal
- Apply prior to expiry, with updated compliance reports.
9. Post-Consent Compliances
Industries must adhere to the following continuous obligations:
9.1 Environmental Monitoring
- Periodic stack emissions and effluent testing
- Online monitoring (for designated industries)
- Ambient air and noise monitoring
9.2 Annual / Periodic Submissions
- Environmental Statement – Form V (annual)
- Hazardous Waste Annual Return
- Water and air monitoring reports
9.3 Inspections
- Scheduled and surprise inspections by SPCB
- Compliance verification visits for renewal
9.4 Record-Keeping
- Logbooks for ETP operation, waste disposal, and DG set operations
- Calibration records of monitoring equipment
10. Penalties for Non-Compliance
Failure to obtain or renew CTE/CTO may result in:
- Closure notice (under Section 33A of Water Act / Section 31A of Air Act)
- Disconnection of electricity or water supply
- Monetary penalties imposed by SPCBs
- Criminal prosecution under environmental acts
- Seizure of machinery or sealing of premises
11. Benefits of Compliance
- Avoidance of regulatory action and penalties
- Enhanced reputation and ESG performance
- Improved operational efficiency and resource conservation
- Access to green financing and sustainability incentives
- Contribution to cleaner environment and social responsibility
12. Conclusion
The Consent to Establish (CTE) and Consent to Operate (CTO) mechanisms form a critical part of India’s environmental governance framework. They ensure industries integrate environmental safeguards into their design, construction, and operational phases. Effective compliance not only prevents pollution but also promotes sustainable industrial growth.
Industries must view CTE/CTO not as bureaucratic hurdles but as essential tools for environmental stewardship and corporate sustainability. A proactive approach—incorporating robust pollution control, transparent compliance practices, and environmentally conscious operations—can significantly enhance both environmental and business outcomes.