Infrastructure facility: energy-efficient public lighting held integral to road projects, qualifying the operator as a developer and eligible for dedu...
Fourth Proviso to Section 153A: extended-period inquiry requires a reasonable, material-based satisfaction that escaped income likely exceeds the thre...
Section 31 review of a resolution plan is limited to statutory compliance and procedural fairness; the Adjudicating Authority cannot reappraise CoC commercial wisdom unless the record shows opacity, incomplete disclosure or abuse of CIRP. The Tribunal found the Information Memorandum and process defective because asset values fell, liabilities disappeared, and no proper audit or meaningful disclosure explained the changes or addressed possible avoidance issues. It also recognised an implied duty on a creditor involved in parallel CIRPs to disclose material facts affecting transparency, though non-disclosure is not automatically fatal. On these facts, the plan was rightly rejected and liquidation confirmed.
Section 31 review of a resolution plan is limited to statutory compliance and procedural fairness; the Adjudicating Authority cannot reappraise CoC commercial wisdom unless the record shows opacity, incomplete disclosure or abuse of CIRP. The Tribunal found the Information Memorandum and process defective because asset values fell, liabilities disappeared, and no proper audit or meaningful disclosure explained the changes or addressed possible avoidance issues. It also recognised an implied duty on a creditor involved in parallel CIRPs to disclose material facts affecting transparency, though non-disclosure is not automatically fatal. On these facts, the plan was rightly rejected and liquidation confirmed.
Note: It is a system-generated summary and is for quick reference only.