Reopening Assessments invalid where satisfaction and jurisdictional approval are absent for third party seized material, leading to quashing of assess...
Benami property exclusion from the insolvency estate: Benami Act proceedings preclude IBC tribunals from reopening attachments or treating such assets...
Exclusion of limitation period: pandemic suspension plus debtor acknowledgement can extend limitation, requiring fresh factfinding on guarantee invoca...
Page of 4813
Press 'Enter' after typing page number.
5941 to 5960 of 96257 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
A foam production line imported in CKD/SKD condition was treated as a complete and integrated injection moulding machine because all essential components were presented together and the process met the functional characteristics of injection moulding. The specific tariff item 8477 10 00 prevailed over residual entries, and the reaction injection moulding process did not take the goods outside that classification. For anti-dumping purposes, the notification was read as covering plastic processing or injection moulding machines in assembled, SKD or CKD form where they retain the essential character of the complete machine. The integrated 32-station system was assessed as one composite unit, and its cumulative clamping force brought it within the notified scope.
A foam production line imported in CKD/SKD condition was treated as a complete and integrated injection moulding machine because all essential components were presented together and the process met the functional characteristics of injection moulding. The specific tariff item 8477 10 00 prevailed over residual entries, and the reaction injection moulding process did not take the goods outside that classification. For anti-dumping purposes, the notification was read as covering plastic processing or injection moulding machines in assembled, SKD or CKD form where they retain the essential character of the complete machine. The integrated 32-station system was assessed as one composite unit, and its cumulative clamping force brought it within the notified scope.
Note: It is a system-generated summary and is for quick reference only.