Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Jurisdictional facts in certificate-of-origin discrepancies can support customs show-cause proceedings, leaving factual explanations for departmental ...
ITAT held that the right to collect toll is an intangible asset, so depreciation at 25% and consequential additional depreciation were allowable. It also upheld reduction of actual cost by the NHAI subsidy under Explanation 10 to section 43(1), disallowing excess depreciation, and sustained rejection of the resurfacing expense provision as contingent and not scientifically estimated. Capitalisation of negative grant liability was disallowed, with depreciation on that amount also rejected. The assessee's alternative claim for enhanced deduction under section 80IA on additions arising from the same eligible infrastructure activity was allowed. Interest under sections 234A, 234B, 234C and 234D was to be recomputed as directed. Penalty under section 271(1)(c) was deleted because disallowance of a claim does not by itself prove inaccurate particulars.
ITAT held that the right to collect toll is an intangible asset, so depreciation at 25% and consequential additional depreciation were allowable. It also upheld reduction of actual cost by the NHAI subsidy under Explanation 10 to section 43(1), disallowing excess depreciation, and sustained rejection of the resurfacing expense provision as contingent and not scientifically estimated. Capitalisation of negative grant liability was disallowed, with depreciation on that amount also rejected. The assessee's alternative claim for enhanced deduction under section 80IA on additions arising from the same eligible infrastructure activity was allowed. Interest under sections 234A, 234B, 234C and 234D was to be recomputed as directed. Penalty under section 271(1)(c) was deleted because disallowance of a claim does not by itself prove inaccurate particulars.
Note: It is a system-generated summary and is for quick reference only.