Drawings/designs supply and erection supervision fees from German contractor: designs non-taxable; supervision taxed as FTS/PE depending on six-month ...
Imported analyser diagnostic cartridges treated as accessories with analyser system, not standalone diagnostic reagents; extended limitation and penal...
Steel-timber construction shuttering/formwork tariff classification dispute: essential character held steel, classified as shuttering under Heading 73...
Section 138 requires cheques to be presented within six months from the date drawn or within validity; undated cheques delivered on the loan date are reckoned from that date, and presentation after that period invalidates Section 138 relief. Separately, guarantor liability under the Master Facility Agreement and Deed of Guarantee arises only after contractually defined events of default and prescribed pre-conditions (including notice/demand) are complied with. Where the record shows ongoing payments, a subsisting restructured account, and no crystallised default or contractual demand, invoking security cheques or Section 138 proceedings amounts to an abuse of process and is impermissible.
Section 138 requires cheques to be presented within six months from the date drawn or within validity; undated cheques delivered on the loan date are reckoned from that date, and presentation after that period invalidates Section 138 relief. Separately, guarantor liability under the Master Facility Agreement and Deed of Guarantee arises only after contractually defined events of default and prescribed pre-conditions (including notice/demand) are complied with. Where the record shows ongoing payments, a subsisting restructured account, and no crystallised default or contractual demand, invoking security cheques or Section 138 proceedings amounts to an abuse of process and is impermissible.
Note: It is a system-generated summary and is for quick reference only.