Condonation of Delay: Tribunal directed condonation where rectification proceedings were pursued, ordering merits adjudication after opportunity to be...
Page of 4809
Press 'Enter' after typing page number.
5321 to 5340 of 96177 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
Arbitrator exceeded contractual scope by creating a non-existent clause to deduct shortfall in Minimum Guaranteed CENVAT Credit (MGCC) from invoices; the correct legal principle is that arbitrators must decide within the four corners of the contract and cannot add terms. The arbitrator wrongly treated the tax component as excluded from MGCC and failed to apply clause 14.5.2 correctly, which only denies reimbursement if documents to avail CENVAT are not produced. Because the arbitrator ventured beyond contractual terms and committed patent illegality, the arbitral award was set aside.
Arbitrator exceeded contractual scope by creating a non-existent clause to deduct shortfall in Minimum Guaranteed CENVAT Credit (MGCC) from invoices; the correct legal principle is that arbitrators must decide within the four corners of the contract and cannot add terms. The arbitrator wrongly treated the tax component as excluded from MGCC and failed to apply clause 14.5.2 correctly, which only denies reimbursement if documents to avail CENVAT are not produced. Because the arbitrator ventured beyond contractual terms and committed patent illegality, the arbitral award was set aside.
Note: It is a system-generated summary and is for quick reference only.