Imported analyser diagnostic cartridges treated as accessories with analyser system, not standalone diagnostic reagents; extended limitation and penal...
Steel-timber construction shuttering/formwork tariff classification dispute: essential character held steel, classified as shuttering under Heading 73...
Family-linked property purchases using fabricated loan agreements and benami-style arrangements held to be crime proceeds; attachment upheld, appeal d...
At admission of a CIRP petition the tribunal cannot decide liquidated damages by summary procedure; such claims are not amenable to summary determination and therefore do not justify denial of admission on that ground alone. Pre-existing contractual disputes about quality and defects, if shown to be substantial, genuine and bona fide (not spurious, speculative or misconceived), can bar admission of a Section 9 application; numerous pre-demand communications indicating defects support that finding. A completion certificate issued with caveats does not amount to unconditional acceptance and does not foreclose contractual disputes. The appeal challenging these conclusions was dismissed.
At admission of a CIRP petition the tribunal cannot decide liquidated damages by summary procedure; such claims are not amenable to summary determination and therefore do not justify denial of admission on that ground alone. Pre-existing contractual disputes about quality and defects, if shown to be substantial, genuine and bona fide (not spurious, speculative or misconceived), can bar admission of a Section 9 application; numerous pre-demand communications indicating defects support that finding. A completion certificate issued with caveats does not amount to unconditional acceptance and does not foreclose contractual disputes. The appeal challenging these conclusions was dismissed.
Note: It is a system-generated summary and is for quick reference only.