Infrastructure facility: energy-efficient public lighting held integral to road projects, qualifying the operator as a developer and eligible for dedu...
Fourth Proviso to Section 153A: extended-period inquiry requires a reasonable, material-based satisfaction that escaped income likely exceeds the thre...
Failure to discharge obligations under Regulation 17(9) raised two legal issues: whether the penalty imposed was excessive and whether security deposit could be forfeited. The Tribunal held that Regulations 8(1) and 20 fix the statutory penalty ceiling at Rs.50,000, so imposing the maximum permitted cannot be treated as disproportionate; and the CBLR does not authorize forfeiture of the security deposit. Applying those statutory prescriptions, the impugned order imposing the maximum permissible penalty and not forfeiting the deposit was found valid, and the revenue's appeal was dismissed. - CESTAT
Failure to discharge obligations under Regulation 17(9) raised two legal issues: whether the penalty imposed was excessive and whether security deposit could be forfeited. The Tribunal held that Regulations 8(1) and 20 fix the statutory penalty ceiling at Rs.50,000, so imposing the maximum permitted cannot be treated as disproportionate; and the CBLR does not authorize forfeiture of the security deposit. Applying those statutory prescriptions, the impugned order imposing the maximum permissible penalty and not forfeiting the deposit was found valid, and the revenue's appeal was dismissed. - CESTAT
Note: It is a system-generated summary and is for quick reference only.