Drawings/designs supply and erection supervision fees from German contractor: designs non-taxable; supervision taxed as FTS/PE depending on six-month ...
Imported analyser diagnostic cartridges treated as accessories with analyser system, not standalone diagnostic reagents; extended limitation and penal...
Steel-timber construction shuttering/formwork tariff classification dispute: essential character held steel, classified as shuttering under Heading 73...
HC considered the challenge to a rectification order adversely affecting the taxpayer without adequate adherence to principles of natural justice. HC set aside the impugned rectification and assessment orders and remitted the matter to the respondent authority for fresh adjudication. This remand is conditional upon the Petitioner depositing 50% of the disputed tax, as confirmed in the rectification order dated 11.09.2024, in cash from the Electronic Cash Register within 30 days of receipt of the order. The Petitioner shall, within the same period, file a detailed reply with supporting documents to the GST DRC-01 show cause notice dated 02.05.2024, treating the assessment order dated 08.07.2024 as an addendum. Petition disposed of.
HC considered the challenge to a rectification order adversely affecting the taxpayer without adequate adherence to principles of natural justice. HC set aside the impugned rectification and assessment orders and remitted the matter to the respondent authority for fresh adjudication. This remand is conditional upon the Petitioner depositing 50% of the disputed tax, as confirmed in the rectification order dated 11.09.2024, in cash from the Electronic Cash Register within 30 days of receipt of the order. The Petitioner shall, within the same period, file a detailed reply with supporting documents to the GST DRC-01 show cause notice dated 02.05.2024, treating the assessment order dated 08.07.2024 as an addendum. Petition disposed of.
Note: It is a system-generated summary and is for quick reference only.