Original works exemption excludes standalone boulder transportation, leaving subcontracted railway-project transport services subject to service tax l...
Annual production capacity determinations excluding stenter galleries support refunds for unconstitutional excise levies without an unjust-enrichment ...
Vicarious liability for cheque dishonour requires specific allegations of responsibility and cheque signatory; generic director allegations cannot sus...
IT Resilience Index requires market infrastructure institutions to automate resilience scoring, early warnings, and continuous service-delivery monito...
ITAT held that assessments under Section 153A were time-barred due to improper information exchange request. The tribunal relied on jurisdictional HC ruling which determined that references not complying with Indo-Swiss DTAA protocol's Article 14 cannot extend assessment limitation period. Specifically, requests made after 30/08/2010 violating the amending protocol's provisions were deemed invalid. Consequently, all challenged assessment orders and consequential penalty orders were set aside, affirming strict adherence to statutory limitation timelines and procedural requirements for international information exchange mechanisms.
ITAT held that assessments under Section 153A were time-barred due to improper information exchange request. The tribunal relied on jurisdictional HC ruling which determined that references not complying with Indo-Swiss DTAA protocol's Article 14 cannot extend assessment limitation period. Specifically, requests made after 30/08/2010 violating the amending protocol's provisions were deemed invalid. Consequently, all challenged assessment orders and consequential penalty orders were set aside, affirming strict adherence to statutory limitation timelines and procedural requirements for international information exchange mechanisms.
Note: It is a system-generated summary and is for quick reference only.