Revisional power in block assessment upheld, undisclosed search income sustained, freight suppression addition restored, accrued lorry hire liability ...
Reassessment and fee-for-technical-services classification: reopening upheld, but certain reimbursements and mobilization charges fell outside treaty ...
Section 80P deduction for co-operative societies remains available despite nominal members and housing society status, with limited interest income tr...
Page of 4828
Press 'Enter' after typing page number.
4821 to 4840 of 96556 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
The document outlines the phased implementation plan for the Electrical Equipment Quality Control Order (EEQCO) issued by the Ministry of Heavy Industries for Low Voltage Switchgear and Controlgear. It specifies the Indian Standards, product categories, specific requirements, and implementation dates for various types of low-voltage switchgear and controlgear, including circuit breakers, switches, disconnectors, contactors, motor starters, control circuit devices, and emergency stop devices. The implementation is divided into multiple phases, with different product categories and specific requirements becoming mandatory on different dates ranging from 10th November 2024 to 10th May 2028. The document aims to ensure compliance with quality standards and facilitate the identification of products covered under the EEQCO during the phased implementation.
The document outlines the phased implementation plan for the Electrical Equipment Quality Control Order (EEQCO) issued by the Ministry of Heavy Industries for Low Voltage Switchgear and Controlgear. It specifies the Indian Standards, product categories, specific requirements, and implementation dates for various types of low-voltage switchgear and controlgear, including circuit breakers, switches, disconnectors, contactors, motor starters, control circuit devices, and emergency stop devices. The implementation is divided into multiple phases, with different product categories and specific requirements becoming mandatory on different dates ranging from 10th November 2024 to 10th May 2028. The document aims to ensure compliance with quality standards and facilitate the identification of products covered under the EEQCO during the phased implementation.
Note: It is a system-generated summary and is for quick reference only.