Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Assessment u/s 144C - Period of limitation - The Ld. CIT-DR argued that the delay was due to the assessee's failure to participate in the verification process as directed by the DRP. However, the Tribunal noted that sub-section (8) of section 144C precludes the DRP from setting aside any proposed variation or issuing any direction for further enquiry and passing of the assessment order. The AO was mandated to complete the assessment within the specified time limit without providing any further opportunity of being heard to the assessee. - The Tribunal concluded that the final assessment order passed by the AO was barred by limitation and, therefore, null in the eyes of law.
Assessment u/s 144C - Period of limitation - The Ld. CIT-DR argued that the delay was due to the assessee's failure to participate in the verification process as directed by the DRP. However, the Tribunal noted that sub-section (8) of section 144C precludes the DRP from setting aside any proposed variation or issuing any direction for further enquiry and passing of the assessment order. The AO was mandated to complete the assessment within the specified time limit without providing any further opportunity of being heard to the assessee. - The Tribunal concluded that the final assessment order passed by the AO was barred by limitation and, therefore, null in the eyes of law.
Note: It is a system-generated summary and is for quick reference only.