Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Levy of penalty u/s 112(a) and Section 114AA of CA on Chartered Engineer - Issuance of Certificate under EPCG scheme without verification - The case involved the issuance of a Chartered Engineer Certificate for the installation and use of imported machinery under the EPCG scheme without verifying whether the machines were actually installed. The Department imposed penalties for non-compliance with verification requirements. The appellant argued good faith reliance on submitted documents and emphasized their limited role in verifying installation. However, the Tribunal held them liable for penalties, considering the seriousness of the offense.
Levy of penalty u/s 112(a) and Section 114AA of CA on Chartered Engineer - Issuance of Certificate under EPCG scheme without verification - The case involved the issuance of a Chartered Engineer Certificate for the installation and use of imported machinery under the EPCG scheme without verifying whether the machines were actually installed. The Department imposed penalties for non-compliance with verification requirements. The appellant argued good faith reliance on submitted documents and emphasized their limited role in verifying installation. However, the Tribunal held them liable for penalties, considering the seriousness of the offense.
Note: It is a system-generated summary and is for quick reference only.