Article 8 treaty coverage excluded third-party airline support services, while documented demonetisation cash receipts remained accepted business inco...
Functional comparability under TNMM requires highway contract benchmarks to reflect operation, maintenance and transfer activities, requiring fresh be...
Objective characteristics govern magnesium bis-glycinate chelate classification as an amino-acid coordination compound, not a food preparation or anti...
Independent professional certification requires pleaded knowledge or complicity for criminal liability; untimely complaints remain barred by limitatio...
Levy of penalty u/s 112(a) and Section 114AA of CA on Chartered Engineer - Issuance of Certificate under EPCG scheme without verification - The case involved the issuance of a Chartered Engineer Certificate for the installation and use of imported machinery under the EPCG scheme without verifying whether the machines were actually installed. The Department imposed penalties for non-compliance with verification requirements. The appellant argued good faith reliance on submitted documents and emphasized their limited role in verifying installation. However, the Tribunal held them liable for penalties, considering the seriousness of the offense.
Levy of penalty u/s 112(a) and Section 114AA of CA on Chartered Engineer - Issuance of Certificate under EPCG scheme without verification - The case involved the issuance of a Chartered Engineer Certificate for the installation and use of imported machinery under the EPCG scheme without verifying whether the machines were actually installed. The Department imposed penalties for non-compliance with verification requirements. The appellant argued good faith reliance on submitted documents and emphasized their limited role in verifying installation. However, the Tribunal held them liable for penalties, considering the seriousness of the offense.
Note: It is a system-generated summary and is for quick reference only.