Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Levy of penalty u/s 25(1) of the Central Excise Rules, 2002 - evasion of duty - The imposition of penalty on both the appellants is un-called for - since Appellant No.1, had transferred the semi-finished goods for machining to the Appellant No.2, without permission from the Department, it is a procedural and technical lapse on the part of the appellants and the same requires imposition of token penalty in terms of Rule 27, which provides a maximum penalty of Rs.5,000/-. Accordingly, penalty on both the appellants is reduced to Rs.5,000/- each. - AT
Levy of penalty u/s 25(1) of the Central Excise Rules, 2002 - evasion of duty - The imposition of penalty on both the appellants is un-called for - since Appellant No.1, had transferred the semi-finished goods for machining to the Appellant No.2, without permission from the Department, it is a procedural and technical lapse on the part of the appellants and the same requires imposition of token penalty in terms of Rule 27, which provides a maximum penalty of Rs.5,000/-. Accordingly, penalty on both the appellants is reduced to Rs.5,000/- each. - AT
Note: It is a system-generated summary and is for quick reference only.