Preventive suspension requires an immediate continuing threat and cannot become indefinite without inquiry, fresh evidence, or proportionate safeguard...
Profiteering - construction service - This benefit was required to be passed on to the recipients. Thus. Section 171 of the CGST, 2017 has been contravened by the Respondent, inasmuch as the additional benefit of ITC @5.86% of the base price received by the Respondent during the period 01.07.2017 to 31.03.2019, was required to be passed on by the Respondent to 17 recipients - NAPA
Profiteering - construction service - This benefit was required to be passed on to the recipients. Thus. Section 171 of the CGST, 2017 has been contravened by the Respondent, inasmuch as the additional benefit of ITC @5.86% of the base price received by the Respondent during the period 01.07.2017 to 31.03.2019, was required to be passed on by the Respondent to 17 recipients - NAPA
Note: It is a system-generated summary and is for quick reference only.