Condonation of delay permits statutory appeal restoration where inadequate service explanation prevented consideration of reassessment and taxable-inc...
Limitation in customs appeals permits exclusion for bona fide refund proceedings, enabling restoration of Bill of Entry assessment challenges on merit...
Warehousing permission requires deposit at the designated bonded warehouse; unauthorised diversion triggers confiscation, redemption fine and importer...
Profiteering - construction service - Respondent had not passed on the benefit of Input Tax Credit (ITC) to him by way of commensurate reduction in the prices - the ITC, as a percentage of the turnover, that was available to the Respondent during the pre-GST period (April-2016 to June-2017) was 1.02%, whereas, during the post-GST period (July-2017 to April, 2020). it was 1.84%. This confirms that in the post-GST period, the Respondent has been benefited from additional ITC to the tune of 0.82% (1.84%-1.02%) of his turnover and the same is required to be passed on by him to the recipients of supply - NAPA
Profiteering - construction service - Respondent had not passed on the benefit of Input Tax Credit (ITC) to him by way of commensurate reduction in the prices - the ITC, as a percentage of the turnover, that was available to the Respondent during the pre-GST period (April-2016 to June-2017) was 1.02%, whereas, during the post-GST period (July-2017 to April, 2020). it was 1.84%. This confirms that in the post-GST period, the Respondent has been benefited from additional ITC to the tune of 0.82% (1.84%-1.02%) of his turnover and the same is required to be passed on by him to the recipients of supply - NAPA
Note: It is a system-generated summary and is for quick reference only.