Fair-rent assessment requires consideration of lease terms, valuation principles and prevailing market rent; the certificate was quashed for fresh rev...
Document Identification Number compliance is satisfied when electronically communicated orders are promptly authenticated through a correctly identifi...
Industrial shrimp-feed machinery classification follows its commercial function, placing integrated production plants under the specific industrial fo...
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Note: It is a system-generated summary and is for quick reference only.