Opportunity to respond to jurisdictional reports is mandatory before customs settlement duty enhancement; connected applications require consistent ad...
Specific customs headings for scaffolding components prevail over general classification, invalidating misclassification proceedings and enabling with...
Liquidator appointment under Section 34 requires consideration of creditor recommendations, valid professional authorisation, and preservation of vali...
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Note: It is a system-generated summary and is for quick reference only.